My WebLink
|
Help
|
About
|
Sign Out
SOUTHERN PACIFIC - FT 034165
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SOUTHERN PACIFIC - FT 034165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:59:12 PM
Creation date
11/4/2021 3:57:03 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/23/1982
LONG TERM AGREEMENTS - NAME
SOUTHERN PACIFIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1� <br />t <br />146-M <br />7. In the event any of the work on property of Railroads as herein <br />contemplated should be advertised for bids by local agencies, the awarded <br />contract(s) shall include the provisions set forth in Exhibits I through <br />L, inclusive, whichever may be applicable, attached and hereby made a part <br />hereof. Said work shall not be commenced by the contractor until: <br />a. Contractor has executed an agreement with Railroads in the <br />form of agreement in Exhibits I through L. <br />b. Local agencies have furnished to Railroads' chief engineering <br />officer a copy of said awarded contract executed by the contractor and a <br />public liability and property damage policy containing endorsement in <br />substantially the same form incorporated in said Exhibits I through L, <br />inclusive. <br />C. Railroads' chief engineering officers have advised local <br />agencies by letter that the limits, form, and wording of said insurance <br />policies are satisfactory to Railroads. <br />The above public liability and property damage insurance policy or <br />policies shall be kept in full force and effect by local agencies' <br />contractor(s) during the performance of said work upon and adjacent to <br />Railroads' property, and thereafter until contractor(s) removes all <br />tools, equipment, and material from Railroads' property and cleans up <br />the premises to a presentable condition satisfactory to Railroads. <br />d. In the event the work to be performed by local agencies' con- <br />tractor involves the property of one railroad only, the above provisions <br />in subpara. a, b, and c, shall apply only to affected railroad. <br />8. Local agencies and their contractor(s) shall give reasonable notice, <br />but not less than five (5) working days, to SP's Area Engineer and WP's <br />Division Engineer, as applicable, before commencing any work in connection <br />with said project upon or adjacent to Railroads' property, and shall <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.