My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
122121
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 4:16:53 PM
Creation date
12/15/2021 4:14:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/21/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist <br />Tribal Cultural Resources <br /> <br />Draft Initial Study – Negative Declaration 83 <br />19 Utilities and Service Systems <br /> <br />Potentially <br />Significant <br />Impact <br />Less than <br />Significant <br />with <br />Mitigation <br />Incorporated <br />Less than <br />Significant <br />Impact <br />No <br />Impact <br />Would the project: <br />a. Require or result in the relocation or <br />construction of new or expanded water, <br />wastewater treatment or storm water <br />drainage, electric power, natural gas, or <br />telecommunications facilities, the <br />construction or relocation of which could <br />cause significant environmental effects? □ □ ■ □ <br />b. Have sufficient water supplies available to <br />serve the project and reasonably <br />foreseeable future development during <br />normal, dry and multiple dry years? □ □ □ ■ <br />c. Result in a determination by the <br />wastewater treatment provider which <br />serves or may serve the project that it has <br />adequate capacity to serve the project’s <br />projected demand in addition to the <br />provider’s existing commitments? □ □ □ ■ <br />d. Generate solid waste in excess of State or <br />local standards, or in excess of the capacity <br />of local infrastructure, or otherwise impair <br />the attainment of solid waste reduction <br />goals? □ □ □ ■ <br />e. Comply with federal, State, and local <br />management and reduction statutes and <br />regulations related to solid waste? □ □ □ ■ <br />a. Would the project require or result in the relocation or construction of new or expanded water, <br />wastewater treatment or storm water drainage, electric power, natural gas, or <br />telecommunications facilities, the construction or relocation of which could cause significant <br />environmental effects? <br />The CAP 2.0 is a policy document aimed at reducing solid waste production and energy and water <br />consumption, amongst other issues, and the related GHG emissions throughout Pleasanton and <br />does not include site-specific infrastructure designs or project proposals. Implementing the CAP 2.0 <br />would not result in an increase in population and housing nor would it facilitate growth beyond that <br />anticipated by the Pleasanton General Plan. As such, implementing the CAP 2.0 would not create <br />new demand related to water, wastewater, stormwater drainage, electric power, natural gas power,
The URL can be used to link to this page
Your browser does not support the video tag.