My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:34:11 AM
Creation date
2/10/2022 9:27:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 1. Key sustainability actions to date' <br />2005 <br />Pleasanton established a <br />Committee on Energy and <br />the Environment (EEC) to <br />inform the City's approach <br />to energy and <br />sustainability. <br />The Pleasanton General <br />Plan provides,a 20=year <br />Vision for'how the City will <br />growand develop through <br />year 2025.. <br />2008 <br />2012 <br />City adopts the <br />Tri -Valley Hazard <br />Mitigation Plan <br />to provide a uniform <br />hazard mitigation strategy <br />to prepare for a range of <br />hazards including, <br />earthquakes, floods and <br />wildland fire. <br />The Pleasanton CAP <br />presents a framework for <br />confronting climate <br />change and engaging the <br />community. <br />201$ <br />201 F3 <br />City adopts the Emergency <br />Operations Plan to <br />enhance the City's <br />emergency and disaster <br />preparedness, response, <br />and recover capabilities, <br />Pleasanton adopts the <br />Pedestrian and Bicycle <br />Master Plan to increase <br />safety and accessibility for <br />cyclists. <br />' For more intormation on City plans, the 2012 CAP 1.0, and EEC, visit the City of Plea sari ton website. <br />Pleasanton Climate Fiction Plan 2.0 <br />2018 <br />2019 <br />provide: an updal:ed <br />rcLI _Irn,1r) frit, C11 q'?Cc <br />rl (_Li 1711 Lil=1l I el_l ��-15 <br />l;_sson.5 n , d, <br />rind con�rnr.�riit;+ Pr!oi itie5. <br />Pleasanton's Trails Master <br />Plan creates a connected <br />trail system. <br />Section 1. Introduction 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.