My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:34:11 AM
Creation date
2/10/2022 9:27:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Strategy BE -1. Advance the decarbonization of <br />buildings <br />Existing Ongoing Actions <br />Emissions reduction 2,200 City Cost N/A <br />henefits ttt 10 Community Cost N/A <br />The City commits to maintain the highest renewable energy choice as <br />the default for all municipal facilities, including opportunities to secure <br />Power Purchase Agreements with other EBCE jurisdictions. <br />Emissions reduction .l 255,700 City Cost N/A <br />Co -benefits At olp0 Community Cost N/A <br />The City commits to maintain the highest renewable energy choice as <br />the default for the community. <br />Primary Actions <br />Emissions reduction 10,100 City Cost $49k <br />Co -benefits O�� Community Cost { ($2.7M) <br />The City will adopt an all -electric building reach code for new <br />construction that limits the development of new gas infrastructure <br />where economically feasible. The City will ensure solutions are <br />equitably tailored to different building, ownership, and use types, <br />which will require a cost-effectiveness evaluation and further outreach <br />Exceptions to the code will be considered. <br />Emissions reduction 16,500 City Cost _ $138k <br />Co -benefits 2; Community Cost $137k <br />The City will develop and implement an Existing Building Electrification <br />Plan to advance electrification of buildings. This plan will be phased <br />in overtime to allow property owners time to adjust and plan for the <br />transition. With this effort, the following should also be considered: <br />Grid Analysis/Improvements <br />Work with EBCE, PG&E, and regional partners to ensure a robust <br />regional electrical grid that minimizes the risk of power outages, <br />increases storage, and reduces demand for diesel or gas generators. <br />Partnerships should consider opportunities for local renewable <br />generation and storage, consistent with Strategy BE -3. <br />Conduct an existing building electrification analysis to identify <br />areas of opportunities, building types, and prerequisites needed to <br />make electrification cost-effective in the community. <br />Consider feasibility for neighborhood microgrids (e.g., <br />neighborhood solar and battery storage) to enhance grid resilience. <br />Municipal and Public Buildings <br />Phase implementation of electrification into existing municipal <br />buildings, consistent with Action S3. <br />Partner with the school district to phase implementation of <br />electrification into school buildings. <br />Pleasanton Climate Action Plan 2.0 Buildings & Energy 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.