My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:34:11 AM
Creation date
2/10/2022 9:27:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Strategy MC -2. Enhance sustainable Secondary Actions <br />production and reduce consumption <br />Existing Ongoing Actions <br />Emissions reduction li' City Cost N/A <br />Co -benefits th w 4 Community Cost N/A <br />The City will continue its ongoing efforts to promote local purchasing for <br />businesses and residents to support local vendors, services, and stores <br />and to reduce GHG emissions from commerce -related transportation, <br />food production, and distribution. <br />Emissions reduction <br />City Cost <br />N/A <br />Co -benefits <br />♦110 <br />Community Cost <br />N/A <br />The City will implement textile recovery drop-off service as outlined <br />in the City's Franchise Agreemen= with PGS. This service will support <br />waste diversion goals and provide convenient means for residents and <br />businesses to donate used textiles. This action will support SB 1383 <br />implementation (Action E7). <br />Emissions reductionIn City Cost $0 <br />Co -benefits 01b Community Cost $0 <br />Using existing resources provided by Alameda County, the City will <br />adopt an Environmentally Preferable Purchasing Policy that includes <br />alternatives for the most carbon -intensive materials the City purchases, <br />such as building materials (e.g., concrete, metals). This policy will <br />complement local purchasing (Action E9) to further support local <br />businesses and support SB 1383 implementation (Action E7). <br />Emissions reduction lu' City Cost $0 <br />Co -benefits this Community Cost ($89k) <br />The City will participate and support a regional Embodied Carbon <br />Reduction Plan that uses a variety of approaches to reduce the total <br />lifecycle carbon footprint of materials (i.e., that considers the carbon <br />footprint of raw materials, manufacturing, transportation, use, and <br />disposal of products). <br />The regional Embodied Carbon Reduction Plan should consider: <br />• Whole building lifecycle analysis for new construction and <br />incentives for achieving reductions <br />• Participation in regional efforts to build local supply chains and <br />economic opportunities <br />• Partnerships to promote low -carbon products <br />• Encouraging carbon -smart and recycled building materials <br />• A low -carbon concrete requirement <br />• Education campaigns and resources <br />Pleasanton Climate Action Plan 2.0 Materials & Consumption 149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.