My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:59:08 AM
Creation date
2/10/2022 9:53:40 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. The project developer shall be responsible for a paying a pro -rata share of the <br />undergrounding costs for the overhead utility lines on Martin Avenue traversing the <br />Selway property. The amount shall be determined by the City Engineer prior to the City <br />Council's approval of the final subdivision map and shall be paid to -the City with <br />recordation of the final map. <br />8. The project developer shall revise the project covered by this approval as follows: <br />a. The typical street section A -A shall be revised as follows: <br />• There shall be a subdrain located under the spill curb to protect the street from <br />excess water migrating from the bioretention swale. <br />• The bioretention swales shall be irrigated and shall be maintained by the HOA <br />or Maintenance Association. <br />• The driveway culverts in the bioretention swale shall be maintained by the HOA <br />or Maintenance Association. <br />• The project developer's engineer shall demonstrate to the satisfaction of the <br />City Engineer that storm water treatment and hydromodification can be <br />accommodated within the bioretention swale. <br />The typical street section B -B shall be revised as follows: <br />• The rolled curb shall match the existing curb on Cameron Avenue. <br />• There shall be an eight -foot wide Public Service Easements (PSE) located on <br />development side of the street. <br />• The north side of the street shall be posted for no parking. <br />• There shall be subdrain located under the curb and gutter per City standards. <br />C. The typical street section C -C and D -D shall be revised as follows: <br />• The rolled curb shall match the existing curb on Cameron Avenue. <br />• There shall be an 8 foot wide Public Service Easements (PSE) on development <br />side of the street. <br />• The north side of the street shall be posted for no parking. <br />• There shall be subdrain located under the curb and gutter on both sides of the <br />street per City standards <br />d. The typical street section E -E shall be revised as follows: <br />• The rolled curb shall match the existing curb on Cameron Avenue. <br />• The street shall be posted for no parking. <br />• There shall be subdrain located under the curb and gutter per City standards <br />e. The existing Storm Drain system on Cameron Drive between Equestrian Drive and <br />Courtney Avenue shall be abandoned and the storm drain pipe and appetencies <br />removed_ <br />The existing water main on Cameron Avenue between Courtney Avenue and the <br />westerly project boundary shall be abandoned and a new water main installed. <br />The existing water services shall be abandoned and new services installed. The <br />existing meter and meter boxes shall be relocated behind the realigned curb per <br />City Standards. The existing fire hydrant shall also be relocated to the new main. <br />Page 5 <br />ITEM NO. 6, PUD -144, PUBLIC COMMENTS PAGE 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.