Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 99 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />b) Erosion <br />Would the project: Result in substantial soil erosion or the loss of topsoil? <br />The 1998 HVSP FEIR determined that within the HVSP planning area, erosion hazards on hilltops are <br />severe to very severe where runoff is rapid, and that the erosion hazard is slight to moderate on the <br />valley floor. However, t his question was not included in the 1998 HVSP FEIR; therefore, no <br />determination was made regarding the level of significance related to soil erosion or the loss of <br />topsoil on the project site. <br />The proposed project would involve grading, building construction, paving, and utility installation <br />activities that could result in erosion and sedimentation. Left unabated, the accumulation of <br />sediment in downstream waterways could result in the blockage of flows, potentially causing <br />increased localized ponding or flooding. However, as discussed in Section 4.11, Hydrology and Water <br />Quality of the 2018 Draft Recirculated EIR, the developer would be required to obtain a National <br />Pollutant Discharge Elimination System (NPDES) permit issued by the RWQCB. <br />Under the NPDES permitting program, the preparation and implementation of Storm Water Pollution <br />Prevention Plans (SWPPPs) are required for construction activities more than 1 acre in size. The <br />SWPPP must identify potential sources of erosion or sedimentation that may be reasonably expected <br />to affect the quality of stormwater discharges as well as identify BMPs that ensure the reduction of <br />these pollutants during stormwater discharges. Typical BMPs used for erosion control include <br />sandbags, detention basins, silt fencing, landscaping, hydroseeding, storm drain inlet protection, <br />street sweeping, and monitoring of water bodies. <br />Prior to construction grading, the project applicant would file a Notice of Intent to comply with the <br />General NPDES Permit issued by the RWQCB and prepare the SWPPP, which addresses the measures <br />that would be included in the project to minimize and control construction and post-construction <br />runoff to the “maximum extent practicable.” In addition, development of the proposed project <br />would be required to comply with the Municipal Code requirements pertaining to grading and <br />excavation. Site grading within the project site would include cuts varying in depth to 15 feet, with <br />fills varying up to 25 feet deep. Retaining walls are also included in the site plan development. <br />Furthermore, the landscaping plans would implement strategies to reduce soil loss during the <br />operational lifetime of the proposed project. <br />In addition, a 2015 Geotechnical Report recommends that pavement areas be sloped at a minimum <br />of 1 percent toward drop inlets and other surface drainage facilities, that roof downspouts be <br />discharged into closed conduits and directed away from buildings to appropriate drainage devices, <br />and that finished grade be sloped away from building exteriors at a minimum of 5 percent for a <br />distance of at least 10 feet. The 2015 report recommended that prior to halting grading activities <br />tops of fill or cut slopes be graded in such a way as to prevent water from flowing freely down <br />slopes. Implementation of the geotechnical report recommendations would be consistent with MM <br />H1, MM H4, MM H5, and MM H7 which require a soils study, slope stability study, grading <br />recommendations, and a final geotechnical report for grading to be prepared for proposed <br />development.