Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />104 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />• All grading and slope preparation activities shall be conducted under the <br />supervision of a licensed Geotechnical Engineer or Certified Engineering <br />Geologist. <br /> <br />Timing: Prior to approval of a grading plan. <br />MM H6 In graded construction areas, replacement vegetation shall be planted as quickly as <br />possible. Graded areas that remain inactive for 10 days or more during the rainy <br />season (October 1 to April 1) without permanent replanting should be hydroseeded <br />or stabilized to inhibit dust. (Same as MM D3). <br />Timing: During grading and construction. <br />MM H7 The final geotechnical report for the grading plan for proposed projects within the <br />Specific Plan Area shall be prepared by a professional engineer and approved by the <br />City of Pleasanton. The report shall address the potential for delayed consolidation <br />within deep fills and associated land surface subsidence. The report shall provide <br />specific recommendations for: <br />• Fill compaction specifications that consider the likelihood of eventual saturation <br />and wetting and drying cycles for the fill materials; <br />• Removal of colluvial material or weathered rock that may be subject to <br />consolidation under the load of proposed fills; <br />• Design and minimizes the variability of fill thickness within fills that underlie <br />structures or other improvements at the project site; and <br />• Design and operation of adequate subsurface drainage systems for fills <br />(particularly beneath heavily irrigated areas or other water sources such as <br />swimming pools or detention basins). Drainage systems for the fills shall be <br />designed to minimize maintenance and ensure long-term performance. Flow from <br />the drainage system shall be controlled so as not to cause or contribute to erosion <br />of existing drainage channels. <br /> <br />Timing: Prior to approval of grading plans. <br />MM H8 On expansive soils, building foundations and improvements shall consist of drilled <br />pier and grade beams, deepened footings (extending below expansive soils). Or <br />post-tensioned slabs. Alternatively, expansive soil shall be removed and replaced <br />with compacted non-expansive soil prior to foundation construction. The plan <br />requires that subgrade soils for pavements consist of moisture-conditioned, lime- <br />treated, or non-expansive soil, and that surface and subsurface water be directed <br />away from foundation elements to minimize variations in soil moisture. <br />Timing: Foundations and improvements to be specified in building plans prior to <br />issuance of building permits.