My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />104 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />• All grading and slope preparation activities shall be conducted under the <br />supervision of a licensed Geotechnical Engineer or Certified Engineering <br />Geologist. <br /> <br />Timing: Prior to approval of a grading plan. <br />MM H6 In graded construction areas, replacement vegetation shall be planted as quickly as <br />possible. Graded areas that remain inactive for 10 days or more during the rainy <br />season (October 1 to April 1) without permanent replanting should be hydroseeded <br />or stabilized to inhibit dust. (Same as MM D3). <br />Timing: During grading and construction. <br />MM H7 The final geotechnical report for the grading plan for proposed projects within the <br />Specific Plan Area shall be prepared by a professional engineer and approved by the <br />City of Pleasanton. The report shall address the potential for delayed consolidation <br />within deep fills and associated land surface subsidence. The report shall provide <br />specific recommendations for: <br />• Fill compaction specifications that consider the likelihood of eventual saturation <br />and wetting and drying cycles for the fill materials; <br />• Removal of colluvial material or weathered rock that may be subject to <br />consolidation under the load of proposed fills; <br />• Design and minimizes the variability of fill thickness within fills that underlie <br />structures or other improvements at the project site; and <br />• Design and operation of adequate subsurface drainage systems for fills <br />(particularly beneath heavily irrigated areas or other water sources such as <br />swimming pools or detention basins). Drainage systems for the fills shall be <br />designed to minimize maintenance and ensure long-term performance. Flow from <br />the drainage system shall be controlled so as not to cause or contribute to erosion <br />of existing drainage channels. <br /> <br />Timing: Prior to approval of grading plans. <br />MM H8 On expansive soils, building foundations and improvements shall consist of drilled <br />pier and grade beams, deepened footings (extending below expansive soils). Or <br />post-tensioned slabs. Alternatively, expansive soil shall be removed and replaced <br />with compacted non-expansive soil prior to foundation construction. The plan <br />requires that subgrade soils for pavements consist of moisture-conditioned, lime- <br />treated, or non-expansive soil, and that surface and subsurface water be directed <br />away from foundation elements to minimize variations in soil moisture. <br />Timing: Foundations and improvements to be specified in building plans prior to <br />issuance of building permits.
The URL can be used to link to this page
Your browser does not support the video tag.