Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 117 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />a) Water Quality <br />Would the project: Violate any water quality standards or waste discharge requirements or <br />otherwise substantially degrade surface or ground water quality? <br />This question was not included in the 1998 HVSP FEIR. No determination was made in the 1998 <br />HVSP FEIR regarding the significance level of impacts associated with water quality. However, the <br />1998 HVSP FEIR determined that the installation of a public water supply and connection to the City <br />water system would improve the quality of the water supplied to and consumed by area residents to <br />meet safe drinking water standards, which would be a beneficial impact. <br />Construction <br />The developer would be required to obtain a NPDES permit issued by the RWQCB. Under the NPDES <br />permitting program, the preparation and implementation of SWPPPs are required for construction <br />activities more than 1 acre in size. The SWPPP must identify potential sources of erosion or <br />sedimentation that may be reasonably expected to affect the quality of stormwater discharges as <br />well as identify BMPs that ensure the reduction of these pollutants during stormwater discharges. <br />Typical BMPs used for erosion control include sandbags, detention basins, silt fencing, landscaping, <br />hydroseeding, storm drain inlet protection, street sweeping, and monitoring of water bodies. <br />Prior to construction grading, the project applicant would file a Notice of Intent to comply with the <br />General NPDES Permit issued by the RWQCB and prepare the SWPPP, which addresses the measures <br />that would be included in the project to minimize and control construction and post-construction <br />runoff to the “maximum extent practicable.” In addition, development of the project would be <br />required to comply with the Municipal Code requirements pertaining to grading and excavation. Site <br />grading within project would include cuts varying in depth to 15 feet, with fills varying up to 25 feet <br />deep. Retaining walls are also included in the site plan development. Furthermore, the landscaping <br />plans would implement strategies to reduce soil loss during the operational lifetime of the project. <br />Adherence to the General Permit would ensure that the project does not violate water quality <br />standards or waste discharge requirements. <br />Operation <br />Operational activities would involve vehicle use, landscape maintenance, and routine maintenance <br />of structures. Leaks of fuel or lubricants, tire wear, brake dust, and fallout from exhaust contribute <br />petroleum hydrocarbons, heavy metals and sediment, which may result in the pollutant load in <br />runoff being transported to receiving waters. Runoff from landscaped areas may contain residual <br />pesticides and nutrients. Consequently, the long-term degradation of runoff water quality in <br />downstream waterways could result from the implementation of the project. However, the project <br />would be required to comply with Chapter 9.14 Stormwater Management and Discharge Control of <br />the City of Pleasanton Municipal Code. Chapter 9.14, also known as the City of Pleasanton <br />Stormwater Management and Discharge Control Ordinance, requires implementation of BMPs and <br />compliance with general permits. Design features would comply with the County’s current NPDES <br />permit and Clean Water Program Stormwater C.3 Guidebook. Compliance with the Stormwater <br />Management and Discharge Ordinance would ensure the implementation of stormwater quality