My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />124 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />Zone 7 Salt Management Plan <br />In May 2004, Zone 7, in cooperation with the other agencies, published the Salt Management Plan to <br />address the increasing level of Total Dissolved Solids in the Main Basin. The Plan was approved by <br />the RWQCB in October 2004 and was incorporated into Zone 7’s Groundwater Management Plan in <br />2005. <br />Therefore, the proposed project would not result in any peculiar effects and would not result in new <br />or more severe impacts related to consistency with a water quality control plan or a sustainable <br />groundwater management plan beyond what was previously analyzed in the 1998 HVSP FEIR. <br />FEIR Mitigation Measures <br />The following mitigation measures were included the 1998 HVSP FEIR. These mitigation measures <br />will be carried forward as Conditions of Approval for the proposed project. <br />MM G1 Design and construction of the project must comply with the Alameda Countywide <br />Clean Water Program requirements for Best Management Practices to control non- <br />point source runoff pollutants. <br />Timing: Prior to approval of grading plans for the Golf Course and all residential <br />development projects in the Specific Plan Area. <br />MM G4 Along Alisal Street, cleaning of culverts and minor grading to improve existing <br />drainage conditions, and replacement of private driveway culverts at the corrected <br />grade at several locations along the street is required. <br />Timing: At construction of the water and sewer systems; then on an as-needed basis. <br />MM G5 The developer of the Spotorno Flat Area is required to replace crossroad drain lines <br />with properly sized culverts, improve site drainage by constructing an earthen vee <br />ditch with consistent fall (or other comparable improvement), and construct storm <br />water detention facilities on the Spotorno Flat Area. <br />Timing: Prior to acceptance of public improvements in the Spotorno Flat Area. <br />Conclusion <br />No new significant impacts to hydrology and water quality would occur. The conclusions from the <br />1998 HVSP FEIR remain unchanged.
The URL can be used to link to this page
Your browser does not support the video tag.