Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />154 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />Table 5: Peak-hour Level of Service <br />Intersection Control1 Peak-hour <br />Existing Without <br />Project <br />Near Term Without <br />Project <br />Cumulative Without <br />Project <br />Delay2,3 LOS3 Delay2,3 LOS3 Delay2,3 LOS3 <br />Sunol <br />Boulevard at <br />Sycamore <br />Road <br />Signal AM 12 B 21 C 20 B <br />PM 13 B 27 C 30 C <br />Sunol <br />Boulevard at <br />Arlington <br />Drive <br />Signal AM 8 A 17 B 17 B <br />PM 9 A 18 B 19 B <br />Sunol <br />Boulevard at <br />Riddell Street <br />SSSC AM 0 (10) A (A) 0 (13) A (B) 0 (17) A (C) <br />PM 0 (14) A (B) 0 (16) A (C) 0 (16) A (C) <br />Sunol <br />Boulevard at I- <br />680 <br />Northbound <br />Ramps <br />SSSC <br />AM 2 (21) A (C) 2 (46) A (E) 4 (>90) A (F) <br />PM 5 (62) A (F) 4 (>90) A (F) 7 (>90) A (F) <br />Sunol <br />Boulevard at I- <br />680 <br />Southbound <br />Ramps <br />SSSC AM 2 (26) A (D) >90 (>90) F (F) >90 (>90) F (F) <br />PM 6 (38) A (E) 22 (>90) C (F) 42 (>90) E (F) <br />Sycamore <br />Creek Way at <br />Sycamore <br />Road <br />SSSC AM 2 (11) A (B) 2 (11) A (B) 3 (11) A (B) <br />PM 2 (10) A (A) 2 (11) A (B) 2 (11) A (B) <br />Pleasanton <br />Sunol <br />Boulevard at <br />Happy Valley <br />Road <br />SSSC AM 1 (9) A (A) 2 (11) A (B) 2 (12) A (B) <br />PM 2 (9) A (A) 2 (10) A (A) 2 (11) A (B) <br />Happy Valley <br />Road at Alisal <br />Street <br />SSSC AM 5 (9) A (A) 6 (9) A (A) 5 (9) A (A) <br />PM 5 (9) A (A) 5 (9) A (A) 5 (9) A (A) <br />Notes: <br />LOS = Level of Service <br />1 SSSC = side-street stop-controlled intersection; Signal = signalized intersection. <br />2 Average intersection delay calculated for signalized intersections using the 2000 HCM method. <br />3 For SSSC intersections, average delay or LOS is listed first followed by the delay or LOS for the worst approach in parentheses. <br />Source: Fehr & Peers 2021. <br />