My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46 <br />The LOA delineation determined that there are four seasonal wetlands and four intermittent <br />drainage channels on the site (Figure 7). Only Seasonal Wetland 4 in the western portion of the <br />site near Alisal Street (0.45 acres) and Drainage 1 (205 linear feet) in the northern portion of the <br />site which is a tributary to Sycamore Creek appear to be hydrologically connected to other <br />waters of the U.S. and therefore would be considered jurisdictional by USACE. The other <br />hydrologic features appear to be isolated and therefore not considered jurisdictional by USACE, <br />however, all the wetlands and channels of the site, whether they are isolated or not, would be <br />considered jurisdictional by the RWQCB. The on-site channels would also be considered <br />jurisdictional by CDFW to the top of the bank. <br />Most of the drainages and wetlands of the site occur in areas proposed as open space and will not <br />be impacted by the project; however, Isolated Wetland 2 (0.02 acre) occurs in an area proposed <br />for bank stabilization and we understand that Seasonal Wetland 4 will likely be temporarily <br />impacted as a result of trenching for a pipeline to convey stormwater from a proposed onsite <br />detention basin and that possibly a small area of the wetland could also be permanently impacted <br />by construction of an emergency vehicle access road, as the designs and locations of these latter <br />project elements were not yet clearly defined at the time of preparation of this report. We would <br />estimate that trenching for the stormwater pipeline and the EVA would result in less than 0.02 <br />acre of temporary disturbance and 0.1 acre of permanent disturbance, respectively.
The URL can be used to link to this page
Your browser does not support the video tag.