My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53 <br />5. A stand of trees, the nature of which makes each dependent upon the other for survival or the <br />area’s natural beauty.” <br />However, the municipal code also states that the definition of a Heritage Tree “…shall not apply <br />to fruit or nut trees when part of an orchard, the produce of which is used for commercial <br />purposes (Ord. 1737 § 1, 1998)”. Removal of Heritage Trees requires a permit from the City. <br />Creek setback <br />The City of Pleasanton determines appropriate creek setbacks on a case by case basis. Required <br />setbacks from a creek will be established by the City of Pleasanton and will be guided by the <br />geological stability and habitat significance of a creek to the City. <br />HCPs/NCCPs <br />No known habitat conservation plans are in effect for this property. <br /> <br />3.3 ENVIRONMENTAL IMPACT/MITIGATION <br />Figure 8 depicts the Spotorno Ranch site plan overlaid on habitats of the site. The project will <br />result in permanent impacts to approximately 28 to 30 acres of primarily grasslands used for hay <br />production as a result of the development of the homes and associated infrastructure. The <br />additional slope stabilization will result in impacts to approximately 4.25 acres, including 0.02 <br />acres of seasonal wetlands. Although no specifics plans were available at the time of the <br />preparation of this document, and details are not provided on Figure 8, there will be some <br />additional impacts as a result of the project occurring in the common parcel along Alisal Street. <br />These project elements will include trenching for the installation of a pipeline to convey <br />stormwater from a proposed detention pond to an existing culvert near Alisal Street as well as <br />construction of an emergency vehicle access road (EVA). Alignments for these latter two <br />elements are still being determined, but potentially these project elements could impact the large <br />seasonal wetland (Wetland 4) occurring within the common parcel. Potential impacts are <br />discussed in greater detail below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.