My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
73 <br />APPENDIX A: MINIMIZATION MEASURES FOR CALIFORNIA TIGER <br />SALAMANDER <br /> <br />The following measures will minimize direct and indirect impacts to California tiger <br />salamanders. <br /> <br /> Prior to the start of construction, a qualified biologist will train all project staff regarding <br />habitat sensitivity, identification of special status species, and required practices. The <br />training shall include the general measures that are being implemented to conserve these <br />species as they relate to the project, the penalties for non-compliance, and the boundaries <br />of the project area. A fact sheet or other supporting materials containing this information <br />should be prepared and distributed. Upon completion of training, employees will sign a <br />form stating that they attended the training and understand all the conservation and <br />protection measures. <br /> <br /> A qualified biologist will survey the project site prior to, and be present to monitor, <br />construction activities during any initial ground disturbance or vegetation clearing or <br />other periods during construction, as necessary. The biologist will capture and relocate <br />any California tiger salamanders that are discovered during the surveys or construction <br />monitoring. Any individuals that are captured should be held for the minimum amount of <br />time necessary to release them to suitable habitat outside of the work area. <br /> <br /> A qualified biologist will stake and flag exclusion zones around all known locations of <br />CTS breeding and upland refugia areas in the construction zone. These areas will be <br />avoided during construction activities to the maximum extent practicable. All <br />construction areas will be flagged, and all activity will be confined to these areas. <br /> <br /> If a CTS is encountered during construction work, activities will cease until the animal is <br />removed and relocated by a qualified biologist. <br /> <br /> Construction activities should be limited to the period from May 1 through October 31. <br /> <br /> Permanent and temporary construction disturbances and other types of project-related <br />disturbances to CTS habitat shall be minimized to the maximum extent practicable and <br />confined to the project site. To minimize temporary disturbances, all project-related <br />vehicle traffic shall be restricted to established roads, construction areas, designated <br />cross-country routes, and other designated areas. These areas also should be included in <br />preconstruction surveys and, to the maximum extent possible, should be established in <br />locations disturbed by previous activities to prevent further adverse effects. Sensitive <br />habitat areas shall be delineated with high visibility flagging or fencing to prevent <br />encroachment of construction personnel and equipment into any sensitive areas during <br />project work activities. At no time shall equipment or personnel be allowed to adversely <br />affect areas outside the project site without authorization from the Service. <br />
The URL can be used to link to this page
Your browser does not support the video tag.