Laserfiche WebLink
Table 3‐2. General Avoidance and Minimization Measures to Reduce Effects on Focal Species  <br />AMM Code  Avoidance and Minimization Measure <br />  <br />GEN‐01  Employees and contractors performing construction activities will receive environmental  <br />sensitivity training. Training will include review of environmental laws and Avoidance and  <br />Minimization Measures (AMMs) that must be followed by all personnel to reduce or avoid  <br />effects on covered species during construction activities.  <br />GEN‐02  Environmental tailboard trainings will take place on an as‐needed basis in the field. The  <br />environmental tailboard trainings will include a brief review of the biology of the covered  <br />species and guidelines that must be followed by all personnel to reduce or avoid negative effects  <br />to these species during construction activities. Directors, Managers, Superintendents, and the  <br />crew foremen and forewomen will be responsible for ensuring that crewmembers comply with  <br />the guidelines.  <br />GEN‐03  Contracts with contractors, construction management firms, and subcontractors will obligate all  <br />contractors to comply with these requirements, AMMs.  <br />GEN‐04  The following will not be allowed at or near work sites for covered activities: trash dumping,  <br />firearms, open fires (such as barbecues) not required by the activity, hunting, and pets (except  <br />for safety in remote locations).  <br />GEN‐05  Vehicles and equipment will be parked on pavement, existing roads, and previously disturbed  <br />areas to the extent practicable.  <br />GEN‐06  Off‐road vehicle travel will be minimized.  <br />GEN‐07  Vehicles will not exceed a speed limit of 15 mph on unpaved roads within natural land‐cover  <br />types, or during off‐road travel.  <br />GEN‐08  Vehicles or equipment will not be refueled within 100 feet of a wetland, stream, or other  <br />waterway unless a bermed and lined refueling area is constructed.  <br />GEN‐09  Vehicles shall be washed only at approved areas. No washing of vehicles shall occur at job sites.  <br />GEN‐10  To discourage the introduction and establishment of invasive plant species, seed  <br />mixtures/straw used within natural vegetation will be either rice straw or weed‐free straw.   <br />GEN‐11  Pipes, culverts and similar materials greater than four inches in diameter, will be stored so as to  <br />prevent covered wildlife species from using these as temporary refuges, and these materials  <br />will be inspected each morning for the presence of animals prior to being moved.  <br />GEN‐12  Erosion control measures will be implemented to reduce sedimentation in wetland habitat  <br />occupied by covered animal and plant species when activities are the source of potential  <br />erosion problems. Plastic mono‐filament netting (erosion control matting) or similar material  <br />containing netting shall not be used at the project. Acceptable substitutes include coconut coir  <br />matting or tackified hydroseeding compounds.  <br />GEN‐13  Stockpiling of material will occur such that direct effects to covered species are avoided.  <br />Stockpiling of material in riparian areas will occur outside of the top of bank, and preferably  <br />outside of the outer riparian dripline and will not exceed 30 days.   <br />GEN‐14  Grading will be restricted to the minimum area necessary.  <br />GEN‐15  Prior to ground disturbing activities in sensitive habitats, project construction boundaries and  <br />access areas will be flagged and temporarily fenced during construction to reduce the potential  <br />for vehicles and equipment to stray into adjacent habitats.  <br />GEN‐16  Significant earth moving‐activities will not be conducted in riparian areas within 24 hours of  <br />predicted storms or after major storms (defined as 1‐inch of rain or more).  <br />GEN‐17  Trenches will be backfilled as soon as possible. Open trenches will be searched each day prior to  <br />construction to ensure no covered species are trapped. Earthen escape ramps will be installed  <br />at intervals prescribed by a qualified biologist.  <br />