My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL <br />ENVIRONMENTAL <br />WATER RESOURCES <br />CONSTRUCTION SERVICES <br /> <br />2010 Crow Canyon Place, Suite 250 San Ramon, CA 94583 (925) 866-9000 Fax (888) 279-2698 <br />www.engeo.com <br />Project No. <br /> 6103.200.000 <br />January 9, 2015 <br /> <br />Mr. Mike O’Hara <br />Tim Lewis Communities <br />Suite 270 <br />Roseville, CA 95661 <br /> <br />Subject: Spotorno Property <br /> Pleasanton, California <br /> <br /> GEOTECHNICAL FEASIBILITY REPORT <br /> <br />Dear Mr. O’Hara: <br /> <br />We prepared this geotechnical feasibility report for the proposed residential development at the <br />approximately 112-acre site referred to as the Spotorno Property. The subject property is located <br />at 1000 Minnie Street in Pleasanton, California and is identified as Assessor Parcel Number <br />(APN) 949-16-6. This report is prepared as outlined in our proposal dated December 29, 2014. <br /> <br />The accompanying report contains a summary of our document review, conclusions, and <br />preliminary recommendations for the geotechnical aspects of the proposed development on the <br />subject site. Based on our study, it is our opinion that the proposed development is feasible from <br />a geotechnical standpoint provided the preliminary recommendations included in this report are <br />incorporated into project planning and development. <br /> <br />We are pleased to be of service to you on this project and look forward to consulting further with <br />you and your design team. <br /> <br />Sincerely, <br /> <br />ENGEO Incorporated <br /> <br /> <br /> <br />Randy Hildebrant, PE Jeff Fippin, GE <br /> <br /> <br /> <br />Phil Stuecheli, CEG <br />rh/jf/ps/bvv
The URL can be used to link to this page
Your browser does not support the video tag.