Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 83 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />MM J1 A California Tiger Salamander Mitigation and Monitoring Plan must be prepared and <br />submitted to the California Department of Fish and Game (DFG)21 for review and <br />approval. Approval of the plan must be obtained from DFG. <br />Timing: Prior to the issuance of any grading permits that affect tiger salamander <br />habitat. <br />MM J3 A pre-construction survey of the Spotorno residential development areas (Spotorno <br />Flat and Upper Valley), Golf Course, and Golf Course Housing areas must be <br />completed to verify the presence or absence of active raptor nests. If any active <br />nests are found, construction must be scheduled so that it will not result in removal <br />or abandonment of an active raptor nest. <br />Timing: Prior to the start of construction activities. <br />MM J6 DFG must be consulted regarding any areas subject to their jurisdiction prior to any <br />encroachment into a designated corridor, and/or consultation with the Corps prior <br />to any activity that would occur within the jurisdictional limits of wetlands or within <br />the bed and bank of a waters of the United States. <br />Timing: Prior to the issuance of a grading permit in applicable areas. <br />MM J10 Provide such additional mitigation of wetland impacts as may be required by the <br />Army Corps of Engineers upon its review of applications for fill permits. The Corps <br />may find the mitigations adequate, or may require additional measures preliminary <br />to issuing fill permits. <br />Timing: Prior to the issuance of grading permits for the applicable areas. <br />Proposed refinements to mitigation language <br />The following refinements to MM J3 in the 1998 HVSP FEIR are proposed to be included in the <br />conditions of approval for the Spotorno Project, and would provide enhanced protection to special- <br />status species, in accordance with the intent of MM J3: <br />Pre-construction surveys of the Spotorno Flat Area shall be conducted to verify the presence or <br />absence of burrowing owl and American badger. These surveys should be conducted between 4 <br />months and 2 weeks prior to ground-breaking activities. If found to be present, avoidance or <br />minimization measures shall be implemented, as needed, to protect these species during <br />construction. <br />Conclusion <br />The 1998 HVSP FEIR found that impacts to biological resources would be less than significant with <br />the incorporation of mitigation measures. Subsequent studies in 2017 and 2021 generally confirm <br />the conclusions of the 1998 HVSP FEIR, and also indicate that the protections afforded by MM J3 <br /> <br />21 When the HVSP FEIR was prepared in 1998, the correct agency was the California Department of Fish and Game. Subsequently, this <br />has become the California Department of Fish and Wildlife (CDFW).