Cities of Dublin and Pleasanton | Disaster Debris Management Plan | 2022 <br />94 <br /> <br /> <br />4. Contract Types <br />FEMA reimburses costs incurred by Tribal and local governments and PNPs using three types of <br />contract payment obligations: fixed price, cost-reimbursement, and, to a limited extent, T&M. The <br />specific contract types related to each of these are described in FEMA’s Procurement Guidance <br />for Recipients and Subrecipients Under 2 C.F.R. Part 200 (Uniform Rules).172 <br /> <br />Tribal and local governments and PNPs must maintain oversight on all contracts to ensure <br />contractors perform according to the conditions and specifications of the contract and any <br />purchase orders. <br /> <br />a. Time and Material Contracts <br />T&M contracts do not provide incentives to the contractor for cost control or labor efficiency. <br />Therefore, use of T&M contracts are only allowed if all of the following apply: <br /> No other contract type was suitable <br /> The contract has a ceiling price that the contractor exceeds at its own risk <br /> The Applicant maintains a high degree of oversight to obtain reasonable assurance that <br />the contractor is using efficient methods and effective cost controls <br /> <br />FEMA generally limits the use of T&M contracts to a reasonable timeframe based on the <br />circumstances during which the Applicant could not define a clear SOW. Therefore, the Applicant <br />should define the SOW as soon as possible to enable procurement of a more acceptable type of <br />contract. <br /> <br />Some entities, such as Rural Electrical Cooperatives, provide the materials necessary to restore <br />the facilities and refer to such contracts as Time and Equipment (T&E) contracts. The limitations <br />and requirements that apply to T&M contracts also apply to T&E contracts. <br /> <br />b. Cost-Plus-Percentage-of-Cost or Percentage-of-Construction <br />In addition to limiting reimbursement to costs that can be determined to be reasonable, FEMA <br />does not reimburse the increased cost associated with the percentage on a cost-plus-percentage- <br />of-cost calculation or percentage-of-construction cost method. This type of contract billing is <br />prohibited as it does not provide incentive to contractors to control costs because the contractor’s <br />profit increases as the costs of performance increase. Instead, it provides a financial interest to <br />the contractor to increase costs so that its profit increases. FEMA identifies these cost methods <br />by determining whether: <br /> Payment is on a predetermined percentage rate <br /> The predetermined percentage rate is applied to actual performance costs <br /> The contractor’s total payment amount is uncertain at the time of contracting <br /> The contractor’s payment increases commensurately with increased performance costs <br /> <br /> <br />