Laserfiche WebLink
Cities of Dublin and Pleasanton | Disaster Debris Management Plan | 2022 <br />130 <br /> <br />SECTION 3. SCOPE OF WORK AND RATE SCHEDULE ITEMS <br />Proposer shall have the capacity to manage a major workforce with multiple Sub-Contractors and <br />to cover the expenses of a major recovery prior to being paid by City. Established management <br />teams must be in place. Proposer shall have the resources to provide the equipment and <br />personnel necessary to cover a disaster. Upon activation by the City, the Proposer must have the <br />capability to have equipment and operators on site within 72 hours to respond to the incident. <br />Proposer shall have experience in five (5) debris removal, reduction, and disposal operations in <br />excess of 200,000 cubic yards within the past ten (10) years where the Proposer was the prime <br />Contractor. <br />It shall be Proposer’s responsibility to load, transport, reduce, and properly dispose of all disaster- <br />generated debris once City issues a Notice to Proceed to Contractor, unless otherwise directed <br />in writing by the City. The City reserves the right to utilize one or more Contractors to remove <br />debris efficiently. The City also reserves the right to utilize different Contractors for various <br />elements including, but not limited to, emergency road clearance, right of way debris removal, <br />and DMS management. <br />Payment for disposal costs (such as tipping fees) incurred by Proposer at a City-approved final <br />disposal site that meets local, state, and federal regulations for disposal will be reimbursed by <br />City as a pass-through cost. Prior to reimbursement by the City, Proposer must furnish an invoice <br />in hard copy and electronic formats, all scale or load tickets issued by the disposal facility, and <br />proof of Proposer payment to the disposal facility. <br />The scope of work under this contract includes the following elements: <br />Emergency Road Clearance <br />Under this contract, work shall consist of all labor, equipment, fuel, and miscellaneous costs <br />necessary to clear and remove debris from City roadways and waterways to make them passable <br />immediately following a declared disaster. All roadways designated by the City shall be clear and <br />passable within a reasonable amount of time as overseen by the City. What constitutes a <br />reasonable period for emergency push operations will be defined by the City at the time of a notice <br />to proceed. This may include roadways in municipalities within the City. Roadways will be cleared <br />as directed by the City. The Proposer shall assist the City and its representatives in ensuring <br />proper documentation of emergency road clearance activities by documenting the type of <br />equipment and/or labor utilized (that is, certification), starting and ending times, and zones/areas <br />cleared. Services performed under this contract element will be compensated using a mutually <br />agreed upon Hourly Labor and Equipment Price Schedule (Schedule 1). <br /> <br />ROW Vegetative Debris Removal <br />Under this contract, work shall consist of all labor, equipment, fuel, traffic control costs, toll costs, <br />and other associated costs necessary to pick up and transport eligible disaster-related vegetative <br />debris from the City ROW to a City-approved DMS or approved final disposal site in accordance <br />with all federal, state, and local regulations. <br />a. Vegetative debris in the City ROW is defined as debris resulting from a hurricane or other <br />natural or human-caused disaster, which has been or will be placed along public ROWs, <br />easements, City parks, alleys, City debris staging areas, and other areas as designated <br />by the City. <br />b. For the purposes of this contract, eligible vegetative debris that is piled in immediate <br />proximity to the actual legal street ROW and that is accessible from the ROW line with <br />loading equipment (that is, not behind a fence or other physical obstacle) will be deemed