My WebLink
|
Help
|
About
|
Sign Out
RES 221284
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2022
>
RES 221284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2022 12:30:31 PM
Creation date
5/4/2022 11:34:28 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/19/2022
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cities of Dublin and Pleasanton | Disaster Debris Management Plan | 2022 <br />134 <br /> <br />and erosion control (for example, an operational water truck, silt fencing, and other best <br />management practices). <br />e. Proposer is responsible for providing twenty-four (24)-hour security at DMS(s). <br />f. Proposer will only permit Proposer vehicles and others specifically authorized by the City <br />or its authorized representative on DMS locations. <br />g. Proposer is responsible for all associated costs necessary to provide DMS(s) utilities (for <br />example, water, lighting, and portable toilets). <br />h. Proposer is responsible for all associated costs necessary to provide DMS(s) fire <br />protection (for example, an operational water truck [sufficient and equipped for fire <br />protection], fire breaks, and a site foreman). <br />i. Proposer is responsible for all associated costs necessary to provide qualified personnel, <br />as well as lined containers or containment areas, for the segregation of visible <br />HHW/contaminants that may be mixed with disaster debris. The cost associated with <br />qualified personnel and lined containers/containment areas for HHW/contaminant <br />segregation is reflected in this scope of work. The City will be responsible for disposing of <br />HHW/contaminant material segregated and stored in lined containers at the DMS(s) <br />j. Proposer shall provide tower(s) from which the City or its authorized representative can <br />make volumetric load calls. The tower provided by the Proposer will meet required <br />minimum specifications, detailed in Section 3.20 Debris Site Tower Specifications. <br />k. Proposer is responsible for operating the DMS(s) in accordance with OSHA, EPA, and <br />CalEPA and CalRecycle guidelines. <br />l. Upon completion of haul-out activities, the Proposer shall restore the site to its original <br />condition prior to site use at their own expense, abide by all local, state, and federal <br />environmental regulatory requirements, and obtain a written release from the City or its <br />authorized representative. Site remediation will include (but is not limited to) ensuring all <br />debris, mulch, and other residual material is adequately removed, returning the original <br />site grade and other physical features including sodding if necessary. Site remediation will <br />also include returning all utilized sites to their original condition as verified through soil and <br />groundwater samples. Site remediation will abide by all state and federal environmental <br />regulatory requirements and is subject to final approval by the City, CalEPA and/or <br />CalRecycle. Site remediation does not include restoring fencing, concession stands, <br />lighting, and other permanent structures that may have been demolished at the City’s <br />direction for DMS(s) operations. <br />DMS Management and Reduction by Grinding <br />a. Under this contract, work shall consist of all labor, equipment, fuel, and miscellaneous <br />costs necessary to reduce disaster debris by grinding. Reduction methods are at the <br />discretion of the City. Grinding must be approved by the City prior to commencement of <br />reduction activities. <br />b. All unreduced disaster debris must be staged separately from reduced debris at the <br />DMS(s). <br />c. Grinding activities must begin within seven days of the opening of the DMS with adequate <br />equipment available to process the type of debris entering the site and prevent stockpiling <br />of excess debris at the DMS. <br />d. Proposer must obtain City’s approval to reduce C&D debris. If approved for reduction by <br />the City, C&D debris must be reduced via grinding in order for the City to compensate the
The URL can be used to link to this page
Your browser does not support the video tag.