My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:36:33 PM
Creation date
6/2/2022 3:27:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton Article 11. Default and Remedies <br /> Franchise Agreement with Pleasanton Garbage Service <br /> <br />City of Pleasanton Page 123 June 7, 2022March 8, 2018 <br />and provided further that the foregoing excuse shall be conditioned on Contractor's cooperation in 4314 <br />making Collection at different times and in different locations. 4315 <br />The Party claiming excuse from performance shall, within two (2) calendar days after such Party has notice 4316 <br />of such cause, give the other Party notice of the facts constituting such cause and asserting its claim to 4317 <br />excuse under this Section. 4318 <br />In the event that either Party validly exercises its rights under this Section, the Parties hereby waive any 4319 <br />claim against each other for any damages sustained thereby. 4320 <br />The partial or complete interruption or discontinuance of Contractor's services caused by one or more of 4321 <br />the events described in this Article shall not constitute a default by Contractor under this Agreement. 4322 <br />Notwithstanding the foregoing, however, (1) the existence of an excuse from performance will not affect 4323 <br />the City's rights under Article 10; and (2) if Contractor is excused from performing its obligations 4324 <br />hereunder for any of the causes listed in this Section for a period of thirty (30) calendar days or more, 4325 <br />other than as the result of third party labor disputes where service cannot be provided for reasons 4326 <br />described earlier in this Section, the City shall nevertheless have the right, in its sole discretion, to 4327 <br />terminate this Agreement by giving ten (10) calendar days’ notice, in which case the provisions of Section 4328 <br />11.3 shall apply. 4329 <br />11.8 Right to Demand Assurances of Performance 4330 <br />If Contractor (1) is the subject of any labor unrest including work stoppage or slowdown, sick-out, 4331 <br />picketing or other concerted job action; (2) appears in the reasonable judgment of City to be unable to 4332 <br />regularly pay its bills as they become due; or (3) is the subject of a civil or criminal judgment or order 4333 <br />entered by a federal, State, regional or local agency for violation of an environmental law, and the City 4334 <br />Manager or their designee believes in good faith that Contractor's ability to perform under the Agreement 4335 <br />has thereby been placed in substantial jeopardy, the City may, at its option and in addition to all other 4336 <br />remedies it may have, demand from Contractor reasonable assurances of timely and proper performance 4337 <br />of this Agreement, in such form and substance as the City Manager or their designee believes in good 4338 <br />faith is reasonably necessary in the circumstances to evidence continued ability to perform under the 4339 <br />Agreement. If Contractor fails or refuses to provide satisfactory assurances of timely and proper 4340 <br />performance in the form and by the date required by City, such failure or refusal shall be an event of 4341 <br />default for purposes of Section 11.1. 4342
The URL can be used to link to this page
Your browser does not support the video tag.