My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:36:33 PM
Creation date
6/2/2022 3:27:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton Article 4. Scope of Agreement <br /> Franchise Agreement with Pleasanton Garbage Service <br /> <br />City of Pleasanton Page 28 June 7, 2022March 8, 2018 <br />the projections and the support for those assumptions, giving full effect to the savings or costs 866 <br />to existing services. 867 <br />8. Plans and schedule for implementing the service change. 868 <br />The City shall review the Contractor’s proposal for the change in scope of services. The City may 869 <br />negotiate with the Contractor to amend the Agreement to reflect the change in scope or the City 870 <br />may choose not to negotiate with the Contractor. 871 <br />If the City chooses to negotiate with the Contractor and the Contractor and City cannot agree on 872 <br />terms and conditions of such services within one hundred twenty (120) calendar days from the 873 <br />date when City first requests a proposal from Contractor to perform such services, Contractor 874 <br />acknowledges and agrees that City may permit other Persons besides Contractor to provide 875 <br />additional Solid Waste, Recyclable Materials, and Organic Materials Collection and Diversion 876 <br />services which do not conflict with the exclusive rights granted to Contractor pursuant to this 877 <br />Agreement. 878 <br />C. Adjustment to Contractor’s Compensation. If the City directs a change in scope or change in one 879 <br />or more Approved Facility, Contractor may be entitled to an adjustment in its compensation in 880 <br />accordance with Section 8.5. 881 <br />D. Implementation of New Services. The Contractor’s implementation of the new services, 882 <br />modification to existing service, or change in the Approved Disposal Site, Approved Recyclable 883 <br />Materials Processing Site, or Approved Organic Materials Processing Site shall occur in a timely, 884 <br />smooth, and seamless manner such that Customers and/or Generators do not experience 885 <br />disruption in Collection services. Contactor shall be responsible for managing the implementation 886 <br />of new or modified Collection services or change in the Approved Disposal Site, Approved Recyclable 887 <br />Materials Processing Site, or Approved Organic Materials Processing Site and other related services 888 <br />and shall do so in accordance with an implementation plan that has been approved by the City. 889 <br />E. Monitoring and Evaluation of Changes in Scope. At the City’s request, the Contractor shall meet 890 <br />with the City to describe the progress of implementing the change in scope. If applicable, and 891 <br />requested by the City, the Contractor shall document the results of the new or modified services on 892 <br />a monthly basis, including, at a minimum, the Tonnage Diverted by material type, the end use or 893 <br />processor of the Diverted materials, the cost per Ton for Transporting and Processing each type of 894 <br />material, and other such information requested by the City that is necessary to evaluate the 895 <br />performance of each program change. 896 <br />At each status meeting, the City and Contractor shall have the opportunity to revise the program or 897 <br />services based on mutually agreed upon terms in accordance with provisions of this Section. The 898 <br />City shall have the right to terminate a program if, in its sole discretion, the Contractor is not 899 <br />achieving the program goals and objectives in a cost-effective manner. Before such termination, 900 <br />the City shall meet and confer with the Contractor for a period not to exceed ninety (90) calendar 901 <br />days to resolve the City’s concerns (“meet and confer period”). Thereafter, the City may utilize a 902 <br />third party to perform these services if the City reasonably believes the third party can improve 903 <br />Contractor’s performance and/or cost. Notwithstanding these changes, Contractor shall continue 904 <br />the program during the “meet and confer period” and, thereafter, until the third party takes over 905 <br />the program. 906
The URL can be used to link to this page
Your browser does not support the video tag.