My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Chapter 5: Project Funding <br />Draft Final Report │ Adopted: April 29, 2022 9 <br /> <br />CHAPTER 5: PROJECT FUNDING <br />For this funding plan, the funds over the next 10-years are planned to be distributed towards 21 projects. <br />Out of the $145.88 million available to program to projects, $20.67 million was identified as committed to <br />project in the 2017 SEP, but not yet disbursed. These projects include: <br />• A-2b: SR 84/I-580 Interchange <br />• A-9a: Crow Canyon Road Improvements Phase 1 <br />• A-9b: Crow Canyon Road Improvements Phase 2 <br />• A-10a: Vasco Road Safety Improvements Phase 1 <br />• A-10b: Vasco Road Safety Improvements Phase 2 <br />• B-8a: Camino Tassajara/Tassajara Road Widening Project (Contra Costa Segment) <br />Approximately $101.62 million is programed for the top priority projects. The projects with priority rank 1 <br />through 15 (Top 15) were selected for funding within this 10-year horizon and programed to receive <br />approximately 10% of their total project cost except for Project B-8 and Project C-11c. Following are the <br />Top 15 projects: <br />• B-4: I-580/Vasco Road Interchange Modification <br />• B-5: I-580/Greenville Road Interchange Modification <br />• B-8a: Camino Tassajara/Tassajara Road Widening Project (Contra Costa Segment) <br />• B-8b: Camino Tassajara/Tassajara Road Widening Project (Dublin Segment) <br />• C-2: Norris Canyon Road Safety Improvement <br />• C-3: Dublin Boulevard – North Canyons Parkway Extensions <br />• C-6: Sunol/680 Interchange Improvements <br />• C-7b: I-680 Express Lanes – Hwy 84 to Alcosta (Northbound) <br />• C-8: Santa Rita/I-580 Interchange <br />• C-10: Innovate 680 <br />• C-11a: Iron Horse Trail Bicycle-Pedestrian Overcrossing – Bollinger Canyon Road <br />• C-11c: Iron Horse Trail – Dublin <br />• C-11d: Iron Horse Trail – Livermore <br />• C-11e: Iron Horse Trail to Shadow Cliffs <br />Additionally, the SEP subcommittee recommended that $800,000 be allocated to Project A-11 Express <br />Bus/Bus Rapid Transit (BRT) - Phase 2 in conjecture with Project C-3 Dublin Boulevard – North Canyons <br />Parkway Extensions. <br />The remaining $23.60 million forecasted over the 10-year horizon was set aside for reserves. <br />A more detailed description of the funding allocation by project are shown in Table 5 through 7. Note that <br />these tables only include those projects that have TVTDF funds programmed in the 2022 SEP Update’s <br />10-year horizon (FY 22/23 – FY 31/32). <br />Table 8 provides a summary of estimated TVTDF revenues throughout the 10-year SEP horizon, project <br />funding allocations, and the overall ongoing fund balance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.