Laserfiche WebLink
TVTC Strategic Expenditure Plan 2022 Update │ Chapter 5: Project Funding <br />Draft Final Report │ Adopted: April 29, 2022 11 <br /> <br />Table 6: List of B Projects in TVTC 2022 SEP <br /> Project <br />Recommended Funding Funding Strategy <br />B-4 I-580/Vasco Road Interchange <br />Modification <br /> <br />$5.14 Million in FY 24/25 <br />$3.43 Million in FY 25/26 <br />Funding is programmed for project development <br />activities including environmental assessment and <br />design. <br />B-8 Camino Tassajara/Tassajara Road <br />Widening Project (East of <br />Blackhawk Drive to North Dublin <br />Ranch Drive) <br />(Contra Costa Segment) <br /> <br />$4.38 Million in FY 24/25 <br />$2.00 Million in FY 25/26 <br />Funding is programmed for the estimated costs for the <br />PS&E and Construction. <br />B-8 Camino Tassajara/Tassajara Road <br />Widening Project (East of <br />Blackhawk Drive to North Dublin <br />Ranch Drive) <br />(Dublin Segment) <br /> <br />$1.45 Million in FY 23/24 <br />Funding is programmed for the estimated costs for the <br />PS&E and Construction. <br />Table 6 only includes projects that have TVTDF funds programmed in the 2022 SEP Update 10-year horizon (FY 22/23 – FY 31/32) <br />