My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />A -1. I -580/I-680 INTERCHANGE (SOUTHBOUND TO EASTBOUND) <br />TVTC PROJECT SPONSOR <br />Alameda County <br />LEAD AGENCY <br />Caltrans <br />PROJECT DESCRIPTION <br />Project A-1 was located at the I-580 and I-680 interchange. The project constructed the southbound to <br />eastbound flyover, northbound to eastbound direct connector, southbound on- and off- loop ramps, and a <br />northbound on-ramp. <br />The project was needed to improve safety and reduce congestion on southbound and northbound I-680 <br />near I-580, and mitigate the impacts of local and regional growth in housing and employment. This project <br />was approved by the voters of Alameda County, as a portion of the Measure B sales tax program. <br />STATUS <br />This project has been completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.