My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />A -5B. I -580 HOV LANE WESTBOUND <br />TVTC PROJECT SPONSOR <br />City of Pleasanton <br />LEAD AGENCY <br />Alameda CTC <br />PROJECT DESCRIPTION <br />Project A-5b was located along westbound I-580 from Greenville Road in Livermore to Foothill Road <br />overcrossing in Dublin and Pleasanton. The project constructed westbound HOV lanes and rehabilitated <br />existing pavement. <br />The project increased capacity, safety, and efficiency for commuters and freight along the primary trade <br />corridor connecting the Bay Area with the Central Valley. <br />The project was completed in two segments: <br />• East Segment – Greenville Road overcrossing to Isabel Avenue in Livermore <br />• West Segment – Isabel Avenue to Foothill Road overcrossing <br />STATUS <br />This project has been completed. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.