My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />B -4. I -580/VASCO ROAD INTERCHANGE MODIFICATION <br />TVTC PROJECT SPONSOR <br />City of Livermore <br />LEAD AGENCY <br />Caltrans <br />PROJECT DESCRIPTION <br />(UPDATED SUMMER 2021) <br />Project B-4 is located at the <br />I-580/Vasco Road interchange in <br />Livermore. The project would modify <br />the interchange by widening the <br />overcrossing to eight lanes and reconstructing the ramps to achieve a modified partial cloverleaf <br />interchange design. <br />STATUS: <br />A PSR and programmatic environmental impact report (EIR) for right-of-way protection has been <br />completed. Right-of-way acquisition is underway. <br />PHASING AND SCHEDULE: <br />A PSR and programmatic environmental impact report (EIR) for right-of-way protection has been <br />completed. Right-of-way acquisition is underway. <br />COST ESTIMATE AND FUNDING SOURCES: <br /> <br />Cost (Millions) $85.65 <br />Funding (Millions) <br />Livermore TIF $67.66 <br />Measure BB $1.38 <br />TVTDF $8.57 <br />Total Funding (Millions) $77.61 <br />Total Funding Shortfall (Millions) $8.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.