My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />Tassajara/Tassajara Road to help mitigate the impacts of local and regional growth in housing and <br />employment within the Tri-Valley. <br />Segment B will widen Tassajara Road from two to four lanes and will improve safety for motorists, <br />bicyclists, and pedestrians, by providing sidewalks, bike lanes, and widening from two to four lanes. <br />Roadway improvements will be consistent with the City of Dublin Bicycle and Pedestrian Master Plan. <br />The ultimate improvements will increase capacity along Tassajara Road to help mitigate the impacts of <br />local and regional growth in housing and employment within the Tri-Valley. <br />STATUS <br />Safety Improvement Project <br />The PSR for the project has been completed. The City of Dublin and Contra Costa County are <br />coordinating on various aspects of the Camino Tassajara/Tassajara Road safety improvements near the <br />Contra Costa/Alameda County line. <br />Roadway Widening Project <br />The PSR for the project has been completed. The City of Dublin and Contra Costa County are <br />coordinating on various aspects of the Camino Tassajara/Tassajara Road widening phase. <br />PHASING AND SCHEDULE <br />Safety Improvement Project <br />Contra Costa County and the City of Dublin are beginning design of Phase 1 improvements of the safety <br />project limits from Windermere Parkway to Moller Ranch (Palisades Drive). <br />Roadway Widening Project <br />Contra Costa County and the City of Dublin are conducting initial preliminary engineering for the Segment <br />A and B roadway widening project within their respective jurisdictions. <br />COST ESTIMATE AND FUNDING SOURCES <br />Contra Costa County: <br />Cost (Millions) $38.19 <br />Funding (Millions) <br />Contra Costa Traffic Mitigation Fees $18.73 <br />TVTDF $6.38 <br />Total Funding (Millions) $25.11 <br />Total Funding Shortfall (Millions) $13.08 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.