My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-2. NORRIS CANYON ROAD SAFETY IMPROVEMENT <br /> <br />TVTC PROJECT SPONSORS <br />Contra Costa County, Alameda County <br />LEAD AGENCY <br />Contra Costa County, Alameda County <br />PROJECT DESCRIPTION <br />(UPDATED SUMMER 2021) <br />Project C-2 includes countermeasures that will increase <br />safety on a Norris Canyon Road, a regional route that <br />connects San Ramon to Alameda County. The proposed <br />project includes the following road segments: <br />• Segment 1 (Norris Canyon Road from San Ramon City Limits to 300 feet west of Ashbourne Drive) <br />– this segment has experienced an increase in run off the road collisions and is slated for <br />countermeasures such as guardrails and other safety countermeasures. <br />• Segment 2 (Norris Canyon Road from 300 feet west of Ashbourne Drive to Alameda County limits) <br />– this segment currently has a 20’ pavement width and no road shoulders. This segment has also <br />experienced an increase in run off the road collisions. Countermeasures include shoulder widening, <br />installation of a retaining wall, and installation of a guardrail. <br />• Segment 3 (Norris Canyon Road from the Alameda County limit line to Crow Canyon Road) – the <br />narrow rural road continues west into Alameda County where the road pavement continues to be <br />narrow with approximately 20’ existing pavement width and no road shoulders. The proposed <br />project would include shoulder widening and guardrail installation to reduce serious injury collisions. <br />STATUS <br />The Project is in the preliminary engineering phase for Segments 1 and 2 as other funding is sought in <br />order to continue planning studies and further design efforts.
The URL can be used to link to this page
Your browser does not support the video tag.