Laserfiche WebLink
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-3. DUBLIN BOULEVARD – NORTH CANYONS PARKWAY EXTENSION <br /> <br />TVTC PROJECT SPONSORS <br />City of Dublin, City of Livermore <br />LEAD AGENCY <br />City of Dublin, City of Livermore, LAVTA <br />PROJECT DESCRIPTION (UPDATED SUMMER 2021) <br />Project C-3 will construct the street extension to connect Dublin Boulevard at Fallon Road in Dublin with <br />North Canyons Parkway in Livermore at Doolan Road. The preliminary phase (currently underway) of this <br />planned project will update the project by incorporating multimodal travel, and the current State, regional, <br />and local priorities. <br />Dublin Boulevard - North Canyons Parkway Extension project would extend Dublin Boulevard in Dublin at <br />its current terminus at Fallon Road to North Canyons Parkway in Livermore. The new extended street is <br />planned to have 4 to 6 travel lanes, bike lanes, sidewalks, curb and gutter, traffic signals/roundabouts, a <br />raised median, bus stops, and all street utilities. This project will consider the provision of dedicated transit <br />lanes in addition to the mixed flow travel lanes for higher level of transit service with 10 to 20-minute <br />headways during appropriate peak demand periods. This project will also require enhanced multimodal <br />connectivity to various land uses along its stretch and at its terminus, including connectivity to 5 PDAs. <br />While addressing Sustainable Communities Strategies, circulation inside and outside the PDAs will be <br />incorporated as part of the design. This project is currently in Preliminary Design Phase (funded by local <br />monies) including the environmental analysis for the project. It will require design and construction funding.