My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-3. DUBLIN BOULEVARD – NORTH CANYONS PARKWAY EXTENSION <br /> <br />TVTC PROJECT SPONSORS <br />City of Dublin, City of Livermore <br />LEAD AGENCY <br />City of Dublin, City of Livermore, LAVTA <br />PROJECT DESCRIPTION (UPDATED SUMMER 2021) <br />Project C-3 will construct the street extension to connect Dublin Boulevard at Fallon Road in Dublin with <br />North Canyons Parkway in Livermore at Doolan Road. The preliminary phase (currently underway) of this <br />planned project will update the project by incorporating multimodal travel, and the current State, regional, <br />and local priorities. <br />Dublin Boulevard - North Canyons Parkway Extension project would extend Dublin Boulevard in Dublin at <br />its current terminus at Fallon Road to North Canyons Parkway in Livermore. The new extended street is <br />planned to have 4 to 6 travel lanes, bike lanes, sidewalks, curb and gutter, traffic signals/roundabouts, a <br />raised median, bus stops, and all street utilities. This project will consider the provision of dedicated transit <br />lanes in addition to the mixed flow travel lanes for higher level of transit service with 10 to 20-minute <br />headways during appropriate peak demand periods. This project will also require enhanced multimodal <br />connectivity to various land uses along its stretch and at its terminus, including connectivity to 5 PDAs. <br />While addressing Sustainable Communities Strategies, circulation inside and outside the PDAs will be <br />incorporated as part of the design. This project is currently in Preliminary Design Phase (funded by local <br />monies) including the environmental analysis for the project. It will require design and construction funding.
The URL can be used to link to this page
Your browser does not support the video tag.