Laserfiche WebLink
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-11A. IRON HORSE TRAIL BICYCLE PEDESTRIAN OVERCROSSING – <br />BOLLINGER CANYON ROAD <br />TVTC PROJECT SPONSORS <br />City of San Ramon, Contra Costa County <br />LEAD AGENCY <br />CCTA, City of San Ramon, Contra Costa County <br />PROJECT DESCRIPTION (UPDATED SUMMER 2021) <br />The Iron Horse Trail (IHT) is an 18-mile regional non-motorized trail that runs north/south through the San <br />Ramon Valley providing critical access to adjacent land uses. The construction of overcrossings at key <br />locations will develop attractive travel alternatives for congestion relief for commute trips as well as better <br />facilities for school, shopping, and recreations trips. Project C-11a will construct an overcrossing at Bollinger <br />Canyon Road. At this location, the overcrossing will provide substantial benefits including: <br />1. Improve safety by eliminating conflicts between pedestrians, bicyclists and motorists; <br />2. Improve motor vehicle circulation by removing the at-grade crossings; <br />3. Reduce and eliminate unsafe crossing maneuvers by pedestrians and bicyclists; <br />4. Enhance safety by providing an environment that encourages walking and bicycling along <br />the Iron Horse Regional Trail; and <br />5. Increase trail usage by improving the connectivity at the Bollinger Canyon Road and Crow <br />Canyon Road crossings.