My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-11C. IRON HORSE TRAIL CROSSING AT DUBLIN BOULEVARD <br />TVTC PROJECT SPONSOR <br />City of Dublin <br />LEAD AGENCY <br />City of Dublin <br />PROJECT DESCRIPTION <br />(UPDATED SUMMER 2021) <br />Project C-11c will build a bicycle <br />and pedestrian bridge over <br />Dublin Boulevard in order to <br />connect two segments of the Iron <br />Horse Trail. This bridge will <br />create a total separation between vehicles and bicyclists/pedestrians. This will eliminate the possibility of <br />motorized vehicles and pedestrians having a collision, making this segment of the road safer for all users. <br />Along with this, congestion will be reduced as cars will no longer have to wait for pedestrians. This reduction <br />of congestion will also allow for the transit to operate more efficiently. Pedestrians and bicyclists will also <br />not have to wait for a walk signal since they will be able to continue their walk or ride without stopping. <br />The bridge will follow ADA requirements so that disabled people will be able to use it as well. This bridge <br />will also be aesthetically pleasing in order to attract users and improve the user’s experience. The bridge <br />will also connect BART to Dublin in a safe manner, encouraging recreational user of the Iron Horse Trail <br />and the opening of local businesses. This safe and fast route of crossing the Iron Horse Trail will promote <br />walking and bicycling for both recreational and commuting purposes in Dublin, this encouraging the shift <br />from motorized vehicles to alternative forms of transportation. <br />STATUS <br />The project is currently in the final design phase. Additionally, environmental analysis of the project is <br />currently in-progress. <br />PHASING AND SCHEDULE <br />Environmental approval was complete in December 2019. PS&E began in June 2018. <br />
The URL can be used to link to this page
Your browser does not support the video tag.