My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-16. I-680 EXPRESS BUS SERVICE <br />TVTC PROJECT SPONSORS <br />Alameda CTC, CCTA <br />LEAD AGENCY <br />Alameda CTC, CCTA <br />PROJECT DESCRIPTION (UPDATED SUMMER 2021) <br />This project proposes to construct capital improvements and purchase buses in order to establish an <br />express bus service on I-680. This project requires the construction of the I-680 Express Lane Gap Closure <br />project, closing the gap in the express lanes between Alcosta Blvd and State Route 84, in order to utilize <br />the express lanes to avoid congestion, reduce travel time, and improve reliably, as part of an express bus <br />service between the Tri-Valley communities and Silicon Valley. This express bus service would likely be <br />combined with and become part of similar efforts by CCTA and their Innovate 680 program, with the intent <br />to serve the entire I-680 corridor extending from Martinez to San Jose, utilizing buses to provide access to <br />additional commute options, including BART, Amtrak, Caltrain, VTA light rail, local bus service, and <br />Greyhound, for those living along the corridor. <br />The service would operate weekdays only, with proposed 20-minute headways during peak periods and <br />one-hour headways during off-peak hours. The service would be bi-directional to avoid substantial <br />deadhead time and to maintain a high level of service. New electric buses would be purchased as part of <br />this project. <br />The project proposes to place express bus stops in the Tri-Valley area at the West Dublin/Pleasanton BART <br />Station and at a future park and ride to be constructed at the Bernal Avenue interchange in Pleasanton. <br />Understanding that the express buses must merge across all lanes of traffic to access the express lane, <br />these stop locations are spaced to efficiently serve the Tri-Valley area while also maximizing the express <br />lane distance the bus is able to utilize in-between bus stops. <br />The estimated costs below assume that at each bus stop location there would be construction of roadway <br />and bus stop improvements, including installation of transit amenities such as shelters, bike lockers, <br />lighting, and real time information signs. <br />STATUS <br />A project schedule has not yet been developed. <br />PHASING AND SCHEDULE <br />The phasing and schedule for this project have not been defined. <br />
The URL can be used to link to this page
Your browser does not support the video tag.