My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br />kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 <br />MEMORANDUM <br />To: <br />From: <br />Date: <br />Tri-Valley Transportation Council Technical Advisory Committee (TVTC TAC) <br />Michael Schmitt, AICP CTP, PTP, RSP1 <br />Elizabeth Chau, P.E. <br />May 5, 2022 <br />Subject: TVTC SEP 2021 Update – AB 602 Supplemental Analysis <br />As the 2020 TVTC Nexus Study was adopted in August of 2021, prior to the implementation of <br />Assembly Bill 602 (AB 602), the Nexus Study and its resultant fee program is not subject to its <br />requirements. However, TVTC has undertaken this supplemental analysis to guide future analysis <br />requirements and to help inform the TVTC how AB 602 may impact the program when the next Nexus <br />Study update1 is completed. This analysis was approved by TVTC Board on April 18, 2022. <br />Background <br />Assembly Bill 602 (AB 602) <br />Assembly Bill 602 was approved and signed into law on September 28, 2021. Among other things, <br />this bill requires that impact fee nexus studies adopted on and after January 1, 2022 must, as <br />appropriate, identify the existing level of service, the new level of service, and include an explanation <br />as to why the new level of service is necessary for each public facility included in an impact fee <br />program. It should be noted that the basis for the required level of service analyses is not specifically <br />defined in AB 602 and that as a practical matter, level of service methods applied to various public <br />facilities need to vary depending on the type of facility being analyzed and the information available. <br />AB 602 also requires that studies adopted after July 1, 2022 either calculate a fee levied or imposed <br />on a housing development project proportionately to the square footage of the proposed units, or <br />make specified findings explaining why square footage is not an appropriate metric to calculate the <br />fee. <br />2020 Nexus Study <br />The performance analysis conducted in support of the 2020 TVTC Nexus Study analyzed the benefits <br />of proposed projects in the aggregate based on specific improvement categories. This aggregate <br />approach is an industry-accepted method when evaluating project impacts on a regional, system- <br />wide basis. This method is especially appropriate where a fee program is targeted to regional <br />improvements, as is the case with TVTC’s fee program. These categories included roadway <br />capacity, transit, safety, pedestrian/bicycle, intersection, and technology. Since these improvement <br />1 The next nexus study is required to be completed within 8 years (2029). <br />Attachment 4
The URL can be used to link to this page
Your browser does not support the video tag.