My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Total Cost <br />(2021$ Million) <br />AB 602 <br />Proportion <br />Allocation% <br />AB 602 TVTDF <br />Eligible Cost <br />(2021$ Million)* <br />A-1 Interstate 580 (I-580)/Interstate 680 (I-680) Interchange (southbound to eastbound)--- <br />A-2a State Route 84 (SR 84) Expressway (I-580 to I-680)$325.40 -- <br />A-2b SR 84/I-580 Interchange $22.70 73%$4.58 <br />A-3 I-680 Auxiliary Lanes (Segment 2)--- <br />A-4 West Dublin/Pleasanton Bay Area Rapid Transit (BART) Station --- <br />A-5a I-580 Eastbound Auxiliary Lane --- <br />A-5b I-580 High Occupancy Vehicle (HOV) Lane Westbound --- <br />A-6 I-680 HOV Lanes, SR 84 to Top of Sunol Grade --- <br />A-7 I-580/Foothill Road/San Ramon Road Interchange Modifications --- <br />A-8 I-680/Alcosta Boulevard Interchange --- <br />A-9a Crow Canyon Road Improvements Phase 1 $10.87 100%$8.42 <br />A-9b Crow Canyon Road Improvements Phase 2 $58.77 100%$57.08 <br />A-10a Vasco Road Safety Improvements Phase 1 $40.57 100%$11.14 <br />A-10b Vasco Road Safety Improvements Phase 2 $31.20 100%$28.62 <br />A-11 Express Bus/Bus Rapid Transit (BRT) – Phase 2 $22.35 100%$21.21 <br />B-1 I-580/I-680 Interchange (westbound to southbound)$1,785.65 3%$34.69 <br />B-2 Fifth Eastbound Lane on I-580 from Santa Rita Road to Vasco Road --- <br />B-3 I-580/First Street Interchange Modification $61.00 100%$7.93 <br />B-4 I-580/Vasco Road Interchange Modification $85.65 100%$16.61 <br />B-5 I-580/Greenville Road Interchange Modification $86.00 100%$18.92 <br />B-6 Jack London Boulevard Extension $28.16 100%$10.08 <br />B-7 El Charro Road Extension (Stoneridge Drive/Jack London Boulevard to Stanley Boulevard)$72.48 -- <br />B-8 Camino Tassajara/Tassajara Road Widening Project (East of Blackhawk Drive to North Dublin Ranch Drive)$88.08 100%$54.55 <br />B-9 Danville Boulevard/Stone Valley Road I-680 Interchange Improvements --- <br />B-10 I-680 Southbound HOV Lane Gap Closure (North Main Street to Rudgear Road)--- <br />B-11a I-680 HOV Direct Access Ramps --- <br />B-11b I-680 Transit Corridor Improvements $277.85 -- <br />C-1 Tesla Road Safety Improvements $13.19 100%$13.19 <br />C-2 Norris Canyon Road Safety Improvement $24.49 99%$24.24 <br />C-3 Dublin Boulevard – North Canyons Parkway Extensions $160.39 33%$35.72 <br />C-4 Vasco Road at Dalton Avenue Intersection Improvements $3.39 25%$0.85 <br />C-5 El Charro Road Widening $68.09 100%$38.09 <br />C-6 Sunol/680 Interchange Improvements $16.60 18%$1.37 <br />C-7 I-680 Express Lanes – Hwy 84 to Alcosta $527.57 100%$300.72
The URL can be used to link to this page
Your browser does not support the video tag.