My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 38 <br /> <br />A -5A. I-580 EASTBOUND AUXILIARY LANE <br />TVTC Project Sponsor: City of Pleasanton <br />Lead Agency: Alameda CTC <br />Project Description: Project A-5a was located along eastbound I-580 from Hacienda Drive in Pleasanton <br />and Greenville Road in Livermore. The project constructed eastbound auxiliary lanes between Isabel <br />Avenue and North Livermore Avenue and between North Livermore Avenue and First Street in Livermore. <br />In addition, the project included widening two eastbound bridges at Arroyo-Los Positas Road and adding <br />final asphalt concrete pavement across all lanes in the eastbound direction from Hacienda Drive to <br />Greenville Road. <br />Status: This project has been completed. <br />A -5B. I-580 HOV LANE WESTBOUND <br />TVTC Project Sponsor: City of Pleasanton <br />Lead Agency: Alameda CTC <br />Project Description: Project A-5b was located along westbound I-580 from Greenville Road in Livermore <br />to Foothill Road overcrossing in Dublin and Pleasanton. The project constructed westbound HOV lanes <br />and rehabilitated existing pavement. <br />The project increased capacity, safety, and efficiency for commuters and freight along the primary trade <br />corridor connecting the Bay Area with the Central Valley. <br />The project was completed in two segments: <br />• East Segment – Greenville Road overcrossing to Isabel Avenue in Livermore <br />• West Segment – Isabel Avenue to Foothill Road overcrossing <br />Status: This project has been completed. <br />A -6. I-680 HOV LANES, SR 84 TO TOP OF SUNOL GRADE <br />TVTC Project Sponsor: City of Pleasanton <br />Lead Agency: Caltrans and Alameda CTC <br />Project Description: Project A-6 was located along southbound I-680 between SR-84 and the top of the <br />Sunol Grade. The project constructed HOV lanes along approximately a 3.5-mile segment of I-680. <br />Status: This project has been completed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.