My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-VALLEY TRANSPORTATION COUNCIL RESOLUTION NO. 2022-07 <br />A RESOLUTION OF THE TRI-VALLEY TRANSPORTATION COUNCIL (TVTC) <br />ADOPTING THE TRI-VALLEY TRANSPORTATION DEVELOPMENT FEE, ADOPTING A NEW STRATEGIC EXPENDITURE PLAN AND PRIORITIZATION OF PROJECTS AND FUNDING PLAN, AND ADOPTING AN AB602 SUPPLEMENT AL ANALYSIS <br />WHEREAS, since 2008, there have been changes in the funding, planning and traffic conditions under which the Tri-Valley Transportation Development Fee (TVTDF) was originally developed. In addition, many of the original 22 projects have been completed and the TVTC has identified 23 new projects (List C)to be considered; andWHEREAS, TVTC entered into a contract with Kimley Hom Associates ("Consultant") to complete the 2020 TVTC Nexus Study and Strategic Expenditure Plan (SEP) in accordance with the requirements of the California Mitigation Fee Act; and WHEREAS, the 2020 Nexus Study considered the following new projects ("Projects") and the number of trips generated by anticipated development of each land use type and determined a Maximum Fee Rate for each of the land uses from Appendix B, of the Study. The Projects considered in the 2020 Nexus Fee Study includes the remaining projects from List A and List Bas well as the following new projects: C-1 Tesla Road Safety Improvement, C-2 Norris Canyon Road Safety Improvement Project, C-3 Dublin Boulevard-North Canyons Parkway Extension, C-4 Vasco Road at Dalton Avenue Intersection Improvements, C-5 El Charro Road Widening, C-6 Sunol/680 Interchange Improvements, C-7 1-680 Express Lanes-Hwy 84 lo Alcosta, C-8 Santa Rita/1-580 Interchange, C-9 Stoneridge/1-680 Interchange, C-10 Innovate 680 C-11 A Iron Horse Trail Bicycle Pedestrian Overcrossing-City of San Ramon, C-1 l BIron Horse Trail Bicycle Pedestrian Overcrossing-City of San Ramon, C-1 1 C Iron Horse Trail Crossing atDublin Boulevard, C-11 D Iron Horse Trail, C-11 E Iron Horse Trail to Shadow Cliffs Connection, C-11 FIron Horse Trail Connection Improvements at Santa Rita Road, C-11 G Iron Horse TrailBicycle/Pedestrian Overcrossing-Town of Danville, C-11 H Iron Horse Trail System-Wide Improvements,C-12 1-680 Interchange Improvements at Hacienda Drive, C-13 Fallon/El Charro Interchange, C-14Valley Link Rail (Phase 1 ), C-15 Technology Enhancements, C-16 1-680 Express Bus Service; andWHEREAS, the Technical Advisory Com mittee and Consultant reviewed forecasts of new development in the Tri-Valley, and outlined the status, scope, costs, and anticipated funding for the Projects; and WHEREAS, on Au&rust 16, 2021, the Tri-Valley Transportation Council ("TVTC") adopted the TriValley Transportation Council 2020 Nexus Study Fee Update, attached hereto as Exhibit A, pursuant to Resolution 2021-1 O; and WHEREAS, the Mitigation Fee Act (California Government Code § 6600l(a)) requires jurisdictions to make certain statu tory findings prior to any action establishing, increasing, or imposing a fee as a condition of approval of a development project; and WHEREAS, since adopting the 2020 Nexus Study in August 2021, Assembly Bill (AB) 602 was approved by the Governor of California and includes additional requirements for nexus fee studies adopted after January 1, 2022. Attachment 3
The URL can be used to link to this page
Your browser does not support the video tag.