Laserfiche WebLink
83 City of Pleasanton Mid-Term Budget Update • FY 2022/23 <br />Prior Year Available Balance <br />The scope of work has been expanded and staff <br />has seen an increase in construction costs due to <br />inflation and cost of materials. <br />Lemoine Bypass Pipeline <br />Project Number: 22199 <br />Water <br />The Lemoine Bypass Pipeline Project corrects a <br />significant water quality issue within Lemoine Ranch <br />Estates. The current system configuration causes <br />water to stay in the pipe too long allowing chlorine <br />levels to drop below required levels. To keep chlorine <br />at the correct level staff regularly manually flushes the <br />pipe. The flushed water is sent to the sewer system. To <br />address the issue, the project will construct a bypass <br />system to allow water to flow in to a lower pressure <br />zone so it won’t be wasted during flushing. The project <br />includes approximately 100 feet of new bypass piping, <br />automated valve, control system and monitoring <br />equipment. <br />Department: Operation Services <br />Project Phase: Assessment <br />Total Appropriation:$104,238 <br />Project Description: <br />Funding Source: Water Replacement <br />Current Funding <br />Fiscal Year Ending Munis ID Fund Description Fund #Amount <br />FY 2022/23 22199 Water Replacement 421 $50,000 <br />Project Justification: <br />Project Description Fund #Amount <br />22199 Water Replacement 421 $54,238