My WebLink
|
Help
|
About
|
Sign Out
PLEASANTON GARBAGE FRANCHISE AGREEMENT 2022
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PLEASANTON GARBAGE FRANCHISE AGREEMENT 2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 11:24:09 AM
Creation date
7/14/2022 11:16:39 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/7/2022
LONG TERM AGREEMENTS - NAME
Pleasanton Garbage Franchise Agreement 2022
LONG TERM AGREEMENTS - TYPE
FRANCHISE AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton Article 5. Collection Services <br /> Franchise Agreement with Pleasanton Garbage Service <br /> <br />City of Pleasanton Page 39 June 7, 2022 <br />5.7 Construction and Demolition Debris Collection 1325 <br />Contractor shall offer and provide Construction and Demolition Debris (C&D) Collection services to any 1326 <br />Customer requesting such service, in a manner which promotes the Customer’s ability to achieve 1327 <br />compliance with the C&D Diversion requirements identified in the City Municipal Code. C&D Collection 1328 <br />service shall be a temporary service, provided only at sites where construction, alteration, remodeling, 1329 <br />repair, or demolition operations are being performed. Contractor shall Collect C&D from Customers that 1330 <br />have requested C&D Collection service as frequently as scheduled by Customer up to six (6) days per week, 1331 <br />but not less than one (1) day per week. Contractor shall provide Drop Boxes for C&D storage and 1332 <br />Collection and shall place Drop Boxes in locations determined by the Customer or construction site 1333 <br />manager. Contractor shall require that all Customers receiving C&D Collection service under this 1334 <br />Agreement are provided a Container for non-C&D Solid Waste. 1335 <br />Contractor shall work with the Customer to provide Collection services that result in a minimum of ninety 1336 <br />percent (90%) of Portland cement concrete and asphalt concrete, and at least seventy-five percent (75%) 1337 <br />of the remaining C&D being Diverted (except as otherwise provided in the City Municipal Code), taking 1338 <br />into account only C&D projects where Contractor Collects all materials. Contractor Billings shall be at the 1339 <br />City-approved Rates for such service. 1340 <br />Contractor shall Transport all C&D Collected under this Agreement to the Approved C&D Processing Site 1341 <br />for Processing. Contractor shall pay all tipping fees and other costs associated with Transporting, 1342 <br />Processing, and/or Disposal of C&D. 1343 <br />Contractor shall observe and comply with all regulations in effect at the Approved C&D Processing Site 1344 <br />and cooperate with and take direction from the operator thereof with respect to delivery of C&D. 1345 <br />5.8 Abandoned Waste Collection 1346 <br />Contractor shall Collect Solid Waste and Bulky Items abandoned by Generators in the City. Contractor 1347 <br />shall dispatch a truck to Collect abandoned materials at locations in the City identified by Contractor or at 1348 <br />locations identified by the City. In instances when the Contractor has received verbal or written request 1349 <br />from the City to Collect abandoned waste at a specific location, Contractor shall Collect abandoned waste 1350 <br />from such location within forty-eight (48) hours of receiving the verbal or written request unless special 1351 <br />circumstances warrant a longer period, in which case Contractor shall notify the City of such circumstances 1352 <br />and the need for additional time to Collect materials within twenty-four (24) hours of the City’s verbal or 1353 <br />written notice to Collect abandoned waste. Contractor shall be responsible for Collection, Transportation, 1354 <br />and Disposal of such material. Contractor shall record the date, time, location, and description of material 1355 <br />Collected including estimated volume of such material; location where such material was Disposed; and 1356 <br />cost of Disposal. Copies of receipts from the Approved Disposal Site for Disposal of abandoned Solid 1357 <br />Waste shall be made available by Contractor upon request by the City. 1358 <br />5.9 Transfer Station Drop-Off Service 1359 <br />5.9.1 Community Drop-off Events 1360 <br />Contractor shall arrange and provide one (1) drop-off event per calendar year at the Approved Transfer 1361 <br />Site, wherein City residents may drop-off up to up to seven (7) cubic yards of Yard Trimmings at no charge 1362
The URL can be used to link to this page
Your browser does not support the video tag.