My WebLink
|
Help
|
About
|
Sign Out
PLEASANTON GARBAGE FRANCHISE AGREEMENT 2022
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PLEASANTON GARBAGE FRANCHISE AGREEMENT 2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 11:24:09 AM
Creation date
7/14/2022 11:16:39 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/7/2022
LONG TERM AGREEMENTS - NAME
Pleasanton Garbage Franchise Agreement 2022
LONG TERM AGREEMENTS - TYPE
FRANCHISE AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton Article 5. Collection Services <br /> Franchise Agreement with Pleasanton Garbage Service <br /> <br />City of Pleasanton Page 46 June 7, 2022 <br />E. Reporting. Contractor shall provide reports on Recyclables Processing as required by Section 6.3 1593 <br />and 6.4. 1594 <br />5.13.3 Organic Materials Processing 1595 <br />A. General. Contractor shall Transport all Organic Materials Collected in the City to the Approved 1596 <br />Organic Materials Processing Site. Contractor shall pay all costs associated with Transfer (if 1597 <br />applicable), Transporting, Processing, Composting, and marketing of Organic Materials. All Organic 1598 <br />Materials shall be Processed for use as Compost, Mulch, or soil amendment and none shall be 1599 <br />Disposed or used as Alternative Daily Cover or Alternative Intermediate Cover. Residue from the 1600 <br />Organic Materials Processing activities shall be Disposed of by Contractor or the Organic Materials 1601 <br />Processing Site Subcontractor at a Disposal Site selected by the Contractor or the Organic Materials 1602 <br />Processing Site Subcontractor. 1603 <br /> Any and all Transfer, Processing, Composting, and other Discarded Materials handling activities 1604 <br />performed in the City shall occur in an enclosed facility and areas used for parking, vehicle access, 1605 <br />and operations shall be paved. 1606 <br />B. Processing Arrangements. Contractor shall secure sufficient capacity with sufficient term to 1607 <br />Process and Compost Organic Materials Collected under this Agreement and Contractor will cause 1608 <br />the Approved Organic Materials Processing Site to Process, Compost, and market Organic Materials. 1609 <br />Promptly upon direction from City, Contractor shall provide City with documentation satisfactory 1610 <br />to City demonstrating availability of Organic Materials Processing and Composting capacity at the 1611 <br />Approved Organic Materials Processing Site and any Approved Transfer Station Site used to deliver 1612 <br />materials to such site. 1613 <br /> Contractor shall keep all existing permits and approvals necessary for use of the Approved Organic 1614 <br />Materials Processing Site in full regulatory compliance or confirm that the Owner or operator of 1615 <br />such facility does so. Contractor shall, upon request, provide copies of permits and/or notices of 1616 <br />violation of permits to the City. 1617 <br /> Contractor may change its selection of the Approved Organic Materials Processing Site following 1618 <br />City’s written approval, but the Contractor’s Compensation and Rates will not be adjusted, and 1619 <br />Contractor will bear any increased Transportation and Processing costs associated with a 1620 <br />Contractor-initiated change in the Approved Organic Materials Processing Site. In such case, 1621 <br />Contractor shall guarantee the same net Organic Materials Processing Cost specified in Exhibit F or 1622 <br />shall reduce the net Organic Materials Processing Costs associated with the use of an Organic 1623 <br />Materials Processing Site(s) different from the Approved Organic Materials Processing Site. If 1624 <br />Contractor elects to use an Organic Materials Processing Site(s) that is different than the Approved 1625 <br />Organic Materials Processing Site, it shall request written approval from the City Manager or their 1626 <br />designee sixty (60) calendar days prior to use of the site and obtain the City’s written approval no 1627 <br />later than ten (10) calendar days prior to use of the site. 1628 <br /> The City shall direct a change to a new Approved Organic Materials Processing Site in the event that 1629 <br />the Approved Organic Materials Processing Site is no longer able to Process some or all of the City’s 1630 <br />Organic Materials due to State or local permit requirements that change the acceptability of Organic 1631 <br />Material type(s). The Contractor shall notify the City in writing immediately and provide 1632 <br />documentation identifying concerns (e.g., letter from Approved Processing Site, Permit citing the 1633
The URL can be used to link to this page
Your browser does not support the video tag.