Laserfiche WebLink
recommendations, or designed by a registered professional engineer and installed according to <br />approved plans. No excavation shall be performed atop or adjacent to a high-risk facility until <br />authorized by the owner of the facility. High-risk facilities are defined as gas transmission <br />pipelines and hazardous liquid pipelines as regulated by the U.S. Department of Transportation <br />Pipeline and Hazardous Materials Safety Administration (US DOT PHMSA) <br />(Address this condition during construction) <br />61. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the project shall <br />pollutants be allowed to enter, clog, or contaminate storm drain pipe networks or open stormwater <br />channels in violation of Pleasanton Municipal Code §9.14.080 et seq. The applicant shall contain <br />all trash and debris for proper disposal to authorized landfills or recyclers. Erosion control features <br />shall be deployed during the rainy season that extends from October 1 sl to April 151h each year, or <br />anytime rain is forecast outside of this period. Best Management Practices (BMPs) shall be strictly <br />followed. Street sweepers must be employed if soil or debris is tracked onto the public roads from <br />vehicles exiting the site. Standard BMPs are available from the California Stormwater Quality <br />Association (CASQA), the United States Environmental Protection Agency (EPA), Caltrans, and <br />others. Notes and/or illustrations shall be added to the plans that describe the BMPs to be utilized <br />during construction. The use of manufactured erosion control woven blankets and straw wattles <br />that utilize plastic monofilament netting is specifically prohibited. <br />(Address this condition during construction) <br />62. DUST CONTROL: Dust control measures must be employed during all phases of construction to <br />prevent airborne nuisance to neighboring properties. All stockpiles or unused materials that can <br />create dust shall be covered or removed. Exposed soil areas shall be routinely watered until <br />surfacing materials or landscaping is installed. Use of dust palliatives shall conform to Caltrans <br />Standard Specification Section 18. Any damage caused by airborne dust to neighboring properties <br />shall be cleaned with costs paid by the applicant. If the applicant fails the address dust as directed <br />by the City, the City shall have the right to enter the property to effectuate the correction, with all <br />costs paid by the applicant or levied as a lien against the applicant's property. <br />(Address this condition during construction) <br />63. PROPERTY NUISANCE: At no time during construction of the project shall the condition of the <br />property become a nuisance as defined in Pleasanton Municipal Code §9.28.020. The City shall <br />have the right to inspect the property for conditions that violate the code standard. If a nuisance is <br />found, the applicant shall immediately submit a plan of correction. Depending on the severity of the <br />nuisance, the City may suspend all construction work until the condition is corrected. Any of the <br />following conditions shall be considered severe: Leaking chemicals that can cause environmental <br />damage; open excavations or any excavation deeper than 4 feet that lacks proper shoring; <br />unsecured materials that can fall to the ground causing damage or injury; open or exposed utilities <br />that could cause electrical shock or contamination of sewer, potable water systems, groundwater <br />wells, or storm drainage networks. If the applicant fails the address the nuisance as directed by the <br />City, the City shall have the right to enter the property to effectuate the correction, with all costs paid <br />by the applicant or levied as a lien against the applicant's property. <br />(Address this condition during construction) <br />64. NOISE: Construction noise is regulated under Pleasanton Municipal Code Chapter 9.04. Noise is <br />prohibited outside of the hours of 8:00 am and 8:00 pm daily except Sundays and holidays when <br />noise is prohibited outside the hours of 10:00 am and 6:00 pm. Noise is defined as a level <br />exceeding 83 dBA at a distance of 25 feet or 86 dBA at any point beyond the boundary of the <br />property under construction. If the applicant fails the address the noise as directed by the City, the <br />City shall have the right to enter the property to effectuate the correction, with all costs paid by the <br />applicant or levied as a lien against the applicant's property. Exceptions to these regulations <br />PUD -145 Planning Commission <br />Page 12 of 17 <br />