Laserfiche WebLink
d. Landscape design plan; <br />e. Irrigation design plan; and <br />f. Grading design plan. <br />78. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final inspection <br />by the Building and Safety Division, the applicant's landscape architect shall submit a Certificate <br />of Completion Package in PDF format to the Landscape Architecture Division for review and <br />approval. The Certificate of Completion Package shall include: <br />a. Project information sheet; <br />b. Certificate of installation according to the landscape documentation package; <br />C. Irrigation scheduling; <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br />e. Landscape irrigation audit report; and <br />f. Soil management report (if not previously submitted). <br />79. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be installed as <br />shown on the approved building permit set and shall be inspected and approved by the <br />Landscape Architecture Division. <br />80, EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro seed <br />mixture designed by the applicant's landscape architect and approved by the Landscape <br />Architecture Division prior to installation. The erosion control shall be maintained by the applicant <br />until permanent landscaping is in place. <br />81. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices and <br />above ground irrigation controls shall be located and screened to minimize their visual impacts. <br />These devices with their proposed screening shall be shown on the landscaping and utility plans <br />submitted with the building permit plans or improvement plans and shall be subject to the review <br />and approval of the City Landscape Architect prior to their installation. If above -ground, they shall <br />be painted forest green or an equivalent dark -green color. Screens shall consist of berms, walls, <br />or landscaping satisfactorily integrated into the landscape plan. Landscape screens shall include <br />shrubbery designed by species and planting density to establish a complete screen within 1 year <br />from the date of planting. Weather protection devices, such as measures to protect pipes from <br />freezing, shall require approval by the City Landscape Architect prior to use; at no time shall <br />fabric or other material not designed and/or intended for this purpose be wrapped around or <br />otherwise placed on these devices. (PROJECT SPECIFIC CONDITION) <br />82. RIGHT-OF-WAY PAVING: The paving in the right-of-way area shall be decomposed granite or an <br />approved alternative pavement that is compactable to a minimum of 90% maximum dry density to <br />accommodate vehicular and/or pedestrian traffic. (PROJECT SPECIFIC CONDITION) <br />83. MAINTENANCE: The applicant and all future owners of the property shall, at no expense to the <br />City, maintain all the landscaped areas related to the project in a healthful, attractive and <br />reasonably weed -free manner consistent with the approved landscape plan, for the duration of <br />the existence of the project. <br />84. SITE LIGHTING: All site lighting shall be designed for consistency with the International Dark -Sky <br />Association's (IDA) Model Lighting Ordinance. This project site shall be considered an LZ -1 zone <br />for design purposes. Lighting shall be subject to review and approval by the City Landscape <br />Architect prior to building permit issuance. (PROJECT SPECIFIC CONDITION) <br />PUD -145 Planning Commission <br />Page 15 of 17 <br />