My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
122022
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 4:20:57 PM
Creation date
12/15/2022 4:20:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/20/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Johnson Dr EDZ Transportation Development Fee' (due at the time building permit is issued) <br /> Due at time building permit is issued. <br /> PMC 3,44.040 Subject to an annual inflation adjustment on January 1 of each year based upon the Engineering News Record <br /> Construction Cost Index(CCI)for the San Francisco Bay Area. <br /> Retail,per square foot <br /> Retail-Parcel 4 $31.08 <br /> Retail-Parcel 7 $31.08 <br /> Retail-Parcel 8 $31.08 <br /> Retail-Parcel 1 $34.17 <br /> Retail-Parcel 6b $36.38 <br /> Retail-Parcel 11 $39.95 <br /> Retail-Parcel 9 $41.88 <br /> Office, per square foot $15.02 <br /> Hotel,per square foot $15.50 <br /> PMC 3.44.040 Subject to an annual inflation adjustment on January 1 of each year based upon the Engineering News <br /> Record Construction Cost Index(CCI)for the San Francisco Bay Area. <br /> G.Water Connection Fees -City <br /> For each single family house,or any other use that is determined by the City Engineer or the Engineer's duly <br /> appointed representative to have a water demand equivalent to that of a single-family house, for normal domestic- <br /> type water uses only, there shall be a connection fee charged for each service connection as indicated in the <br /> following table. This shall be the minimum charge for all uses. For all other uses, for each service connection,a <br /> charge shall be made as established in the following table depending on the size of the meter required for that <br /> service connection as determined by the City Engineer or his duly appointed representative. <br /> Pleasanton All Other Service <br /> Meter Size limprovementi Connections <br /> 5/8 inch(displacement type) $460 $1,200 <br /> 3/4 inch(displacement type) $690 $1,800 <br /> 1 inch(displacement type) $1,150 $3,000 <br /> Amounts DO NOT include water meter installation 1.5 inch(displacement type) $2,300 $6,000 <br /> fees,which are revised periodically based on 2"(displacement type) $3,680 $9,600 <br /> current costs for labor&materials as authorized in 2"Mueller MVR $5,290 $13,800 <br /> Section 8"Water Meter&Installation Fees". <br /> 2"(OMNI C2) $7,360 $19,200 <br /> 3 inch(OMNI C2) $8,050 $21,000 <br /> 4 inch(OMNI C2) $23,000 $60,000 <br /> 6 inch(OMNI C2) $46,000 $120,000 <br /> 8 inch(OMNI C2) $80,500 $210,000 <br /> 10 inch(OMNI C2) $126,500 $330,000 <br /> For any larger service connection, the City Engineer or his duly appointed representative will determine the <br /> charge;or a battery of meters maybe used at the City Engineer's option. <br /> Any change in use or addition requiring greater capacity will require the payment of additional fees at the <br /> rates established herein as a condition of continued service. <br />
The URL can be used to link to this page
Your browser does not support the video tag.