My WebLink
|
Help
|
About
|
Sign Out
21 ATTACHMENT 1-3
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
122022
>
21 ATTACHMENT 1-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 11:59:22 AM
Creation date
12/16/2022 11:34:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/20/2022
DESTRUCT DATE
15Y
Document Relationships
21
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\122022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT Redlines <br /> Housing Element Section 4B <br /> Improvement Program (CIP) and make affirmative changes by next CIP adoption (June <br /> 2023) <br /> • Funding Source: Capital Improvement Program Budget, Sewer Enterprise Fund, Housing <br /> Grants, Planning Division Budget <br /> • Quantified Objective: Implement seven identified projects during the planning period <br /> Program 4.5 <br /> The City will take action to ensure adequate water supply to serve the needs of existing and future <br /> residents resulting from the additional housing capacity described in this Housing Element. As <br /> stated in Appendix C (Housing Constraints), potential options include: <br /> 1. Implementation of the PFAS and Groundwater Wells Rehabilitation Project, which <br /> includes constructing new a new treatment facility for groundwater from City wells, as <br /> well as rehabilitating existing wells. <br /> 2. Drilling of new City wells with or without PFAS treatment, depending on the location of <br /> the wells. This would require test drilling and groundwater sampling. <br /> 3. Developing an agreement with the Zone 7 Water Agency or-sviding--to provide 100 <br /> percent of all water supply, both in the near term and in the future. <br /> 4. Purchasing water supply from outside Zone 7. <br /> • Responsible Agency: Operation Services Department, Planning Division <br /> • Time Period: XXXXComplete study of alternatives: October 2023. Implementation of <br /> selected project alternative: December 2025. <br /> • Funding Source: Grant Funding, General Fund, and other sources as appropriate <br /> Program 4.6 <br /> The City allows for parking reductions in certain circumstances, and state law establishes no <br /> minimum parking requirement or highly reduced parking rates for qualifying projects (e.g., state <br /> density bonus law, SB 35, AB 2097, etc.). To further reduce the impacts of parking requirements <br /> on the production of housing, the City will assess and update multi-family parking standards <br /> citywide to establish lower rates for studios and one-bedroom units and reduce the covered <br /> parking requirement (i.e., not require covered parking for studio and one-bedroom units). <br /> • Responsible Agency: Planning Division <br /> • Time Period: June 2024 <br /> • Funding Source: Planning Division Budget <br />
The URL can be used to link to this page
Your browser does not support the video tag.