My WebLink
|
Help
|
About
|
Sign Out
RAMPRASAD SRIRAMA & BHAVNA ANAND
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
R
>
RAMPRASAD SRIRAMA & BHAVNA ANAND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 9:11:00 AM
Creation date
1/4/2023 4:27:04 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
11/17/2022
LONG TERM AGREEMENTS - NAME
SUBDIVISION AGREEMENT
LONG TERM AGREEMENTS - TYPE
SUBDIVISION AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
3707 TRENERY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALEXANDER and ENGINEER'S ESTIMATE 10/5/2022 <br /> ASSOCIATES, INC. PM 11135 <br /> SURVEYORS * ENGINEERS*PLANNERS <br /> A. MOBILIZATION $ 5,000.00 <br /> B. GRADING $ 5,750.00 <br /> C. STORM DRAIN $ 68,980.00 <br /> D. SANITARY SEWER $ 13,000.00 <br /> E. EROSION CONTROL $ 5,000.00 <br /> F. JOINT TRENCH $ 10,000.00 <br /> SUBTOTAL $ 107,730.00 <br /> 15% CONTINGENCIES $ 16,159.50 <br /> GRAND TOTAL $ 123,889.50 <br /> ESTIMATES OF PROBABLE CONSTRUCTION COSTS PREPARED BY THE ENGINEER REPRESENT ITS BEST JUDGMENT AS A <br /> DESIGN PROFESSIONAL FAMILIAR WITH THE CONSTRUCTION INDUSTRY. IT IS RECOGNIZED, HOWEVER, THAT NEITHER THE <br /> DESIGNER NOR THE DEVELOPER HAS ANY CONTROL OVER THE COST OF LABOR, MATERIALS, OR EQUIPMENT, OR THE <br /> CONTRACTOR'S METHODS OF DETERMINING BID PRICES, OR OVER COMPETITIVE BIDDING OR MARKET CONDITIONS. <br /> ACCORDINGLY THE ENGINEER CANNOT AND DOES NOT GUARANTEE THAT BIDS WILL NOT VARY FROM ANY ESTIMATES OF <br /> PROBABLE CONSTRUCTION COSTS OR OTHER COST ESTIMATE PREPARED BY THE ENGINEER. ANY PROJECT BUDGET SHALL <br /> BE ADJUSTED TO REFLECT ANY CHANGE IN THE GENERAL LEVEL OF PRICES IN THE CONSTRUCTION INDUSTRY BETWEEN <br /> THE DATE OF SUBMISSION OF THE CONSTRUCTION DOCUMENTS TO THE DEVELOPER AND THE DATE ON WHICH PROPOSALS <br /> ARE SOUGHT. <br /> iø0.0/1o.C 667 ? � ';:; <br /> ac Exp 8-:�J� 22 .:� <br /> -7, CSV <br /> SOF <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.