My WebLink
|
Help
|
About
|
Sign Out
3_Exhibits A-D
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
01-11
>
3_Exhibits A-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 2:35:17 PM
Creation date
1/9/2023 2:34:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/11/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\01-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D <br />Provided for the December 15, 2022, Joint Planning Commission and City Council meeting <br />Redistributed for the January 11, 2023, Planning Commission meeting <br />From:Mike Tassano <MTassano@cityofpleasantonca.gov> <br />Sent:Friday, November 18, 2022 11:30 AM <br />To:Dave Limato <br />Cc:Shweta Bonn <sbonn@cityofpleasantonca.gov>; Mayor and City Council <br /><citycouncil@cityofpleasantonca.gov>; Gerry Beaudin <gbeaudin@cityofpleasantonca.gov>; Ellen Clark <br /><eclark@cityofpleasantonca.gov>; Matthew Nelson <manelson@cityofpleasantonca.gov> <br />Subject:: Request for Information on Traffic for the next Stoneridge Framework Meeting <br />David, <br />Thank you <br />have anything to that level of detail regarding the Stoneridge Mall Framework. We are still in the <br />process of evaluating the impacts of the additional housing and not yet to the point where we can show <br />what (if any) modifications would be necessary. <br />I do, however, have the overhead for the Stoneridge Drive at Johnson Drive intersection that is <br />underway. This plan has a second westbound to northbound lane added to the existing flyover and you <br />can see the construction crew preparing this work which will begin in earnest in April of next year (we <br />are not able to build over waterways in the winter). Caltrans did not require us to make any alterations <br />to the freeway mainline, so the 2 lane on ramp will merge down to a single lane and the existing <br />configuration prior to the 680 northbound mainline. <br />I have my staff looking for an overhead that more clearly depicts the changes that we have shared at <br />previous public meetings. I included the overheard that I have here on my computer and thought I <br />would share it with you. <br />Please let me know if you have questions on the design or need assistance reading the plan. <br />Mike Tassano <br />Deputy Director of Community Development, Transportation <br />D: 925-931-5670 <br />F: 925-931-5478 <br />mtassano@cityofpleasantonca.gov <br />City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566
The URL can be used to link to this page
Your browser does not support the video tag.