Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> d) In flood hazard,tsunami,or seiche zones,would the project risk release of pollutants due to project <br /> inundation? <br /> Seiche and tsunami are short duration earthquake-generated water waves in large enclosed <br /> bodies of water and the open ocean, respectively. The extent and severity of a seiche or tsunami <br /> would be dependent upon ground motions and fault offset from nearby active faults. The project <br /> site is not located adjacent to any large bodies of water and is not located downstream of a dam. <br /> In addition,the project site is not located within a 100-year or 500-year flood hazard zone (FEMA <br /> 2021).Therefore,the project is not located within a flood hazard,tsunami, or seiche zone, and is <br /> not expected to be inundated.The project would have no impact. <br /> e) Would the project conflict with or obstruct implementation of a water quality control plan or <br /> sustainable groundwater management plan? <br /> The project would have no impact on groundwater and would therefore have no impact on a <br /> groundwater management plan. As discussed above, the project would not require the use of <br /> groundwater, would not interfere with groundwater recharge, and would not introduce water <br /> pollutants into stormwater runoff.Therefore,the project would not adversely affect water quality or <br /> groundwater supplies. The project would have no impact due to conflicting with or obstructing <br /> implementation of a water quality control plan or sustainable groundwater management plan. <br /> Mitigation Measures <br /> See Section 3.7 for MM GEO-1 and Section 3.9 for MM HAZ-1. <br /> 3.11 Land Use and Planning <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant <br /> Impact Incorporated Impact No Impact <br /> XI. LAND USE AND PLANNING - Would the project: <br /> a) Physically divide an established ❑ ❑ ❑ <br /> community? <br /> b) Cause a significant environmental <br /> impact due to a conflict with any land <br /> use plan, policy,or regulation adopted ❑ ❑ ❑ <br /> for the purpose of avoiding or mitigating <br /> an environmental effect? <br /> Setting <br /> The project site is surrounded by existing park and recreational facilities.The majority of the trail would be <br /> contained within Augustin Bernal Community Park,and a portion of the trail would cross Golden Eagle HOA <br /> property,subject to an access easement.To the west, north,and south is Pleasanton Ridge Regional Park, <br /> 12956 <br /> DUDEK 68 April 2022 <br />