Laserfiche WebLink
sensitivity for prehistoric sites, they may contain unknown archaeological <br />resources. Site 7, for example, contains a Native American burial ground. <br />2.Implementation of Mitigation Measure 4.D-2 set forth in <br />Table 6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.D-2 <br />would be reduced to a less than significant level and is hereby incorporated by <br />reference and described below: <br />4.D-2: Prior to the issuance of grading permits for development on the potential <br />sites for rezoning that have not been previously developed or have only <br />experienced minimal disturbance, including Sites 6, 7, 8, and 18, the applicant <br />shall submit to the City an archaeological mitigation program that has been <br />prepared by a licensed archaeologist with input from a Native American <br />Representative. <br />The applicant shall implement the requirements and measures of this program, <br />which will include, but not be limited to: <br />Submission of periodic status reports to the City of Pleasanton and the NAHC. <br />Submission of a final report, matching the format of the final report submitted for <br />CA-Ala-613/H, dated March 2005, to the City and the NAHC. <br />A qualified archaeologist and the Native American Representative designated by <br />the NAHC will be present on site during the grading and trenching for the <br />foundations, utility services, or other on-site excavation, in order to determine if <br />any bone, shell, or artifacts are uncovered. If human remains are uncovered, the <br />applicant will implement Mitigation Measure 4.D-4, below. <br />Site(s) affected: Sites 6-8, 18 <br />Draft SEIR, pp. 4.D-16 to 4.D-17.) <br />Impact 4.D-3 <br />Development facilitated by the General Plan Amendment and rezonings may <br />directly or indirectly destroy a unique paleontological resource or site or unique geologic feature. <br />The SEIR evaluates the impacts of the proposed project related to the potential <br />destruction of unique paleontological resources or a unique geologic feature. The city has <br />moderate paleontological sensitivity and it is possible that paleontological resources could be <br />disturbed during construction activities. <br />Significance Before Mitigation: Significant <br />Significance After Mitigation: Less than Significant <br />Finding: Changes or alterations have been required in or incorporated into the <br />Project that would avoid or substantially lessen the significant environmental <br />effect as identified in the SEIR. Mitigation Measure 4.D-3, which has been