My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:30:15 PM
Creation date
2/16/2023 1:15:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
exceed 65 dB Ldn at these activity areas. This shall be done thru site orientation <br />i.e., location of activity areas away from roadways or shielded by project <br />buildings) or with the inclusion of appropriate noise barriers. Prior to PUD <br />approval, the project applicant shall be required to submit an acoustical analysis <br />demonstrating that outdoor activity spaces associated with sensitive uses do not <br />exceed 65 dB Ldn within these spaces. <br />Site(s) affected: All <br />Draft SEIR, pp. 4.J-35 to 4.J-36.) <br />7. Public Services and Utilities <br />Impact 4.L-2 <br />Development facilitated by the General Plan Amendment and rezonings could <br />potentially require new or expanded water supply resources or entitlements. <br />The SEIR evaluates the impact of the proposed project related to the potential <br />need for new or expanded water supply resources or entitlements. New housing development <br />as facilitated on the potential sites for rezoning by the proposed Housing Element would <br />increase demand for water and could require new water supply sources. <br />Significance Before Mitigation: Significant <br />Significance After Mitigation: Less than Significant <br />Finding: Changes or alterations have been required in or incorporated into the <br />Project that would avoid or substantially lessen the significant environmental <br />effect as identified in the SEIR. Mitigation Measure 4.L-2 which is required in or <br />incorporated into the Project, will reduce the significant environmental impact to a <br />less than significant level. <br />Facts in Support of Finding: The following facts and mitigation measures indicate <br />that the impact will be reduced to less than significant. <br />1.Future water demand resulting from new development has <br />been addressed by Zone 7's capital improvement projects to secure more water. <br />In order to meet future needs, Zone 7 plans to improve conveyance, storage, and <br />groundwater recharge and extraction facilities to accommodate the growth <br />outlined in its customers' general plans, which include the City of Pleasanton and <br />the proposed Housing Element. To further ensure supply is adequate, the City <br />has developed a Condition of Approval in the 2011 WSA for residential <br />development on the potential sites for rezoning. <br />2.Implementation of Mitigation Measure 4.L-2 set forth in <br />Table 6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.L-2 <br />would be reduced to a less than significant level and is hereby incorporated by <br />reference and described below. <br />4.L-2: Prior to the recordation of a Final Map, the issuance of a grading permit, <br />the issuance of a building permit, or utility extension approval to the site, <br />whichever is sooner, the applicant shall submit written verification from Zone 7
The URL can be used to link to this page
Your browser does not support the video tag.