Laserfiche WebLink
2.Mitigation Measures 4.D-1a and 4.D-1b include the <br />requirement for a historic resource evaluation at Sites 6 and 21. Mitigation <br />Measure D-1 a and D-1 b as set forth in Table 6-1 of the Final EIR and listed in the <br />MMRP are hereby incorporated by reference and described below: <br />4.D-1 a: On Sites 6 and 21, prior to PUD approval or demolition, whichever <br />comes first, the project applicant shall have a historic resource evaluation <br />conducted for the ice house and farmhouse on Site 6 and for the residence on <br />Site 21 as applicable. If it is determined that a structure is historic, Mitigation <br />Measure 4.D-1b will be required. If a structure is not found to be historic, <br />demolition of the structure will be considered a less than significant impact. <br />4.D-lb: If the historic resources evaluation determines that Site 6 or 21 contains <br />a historic resource, prior to demolition, the structure shall be documented <br />according to Historic American Building Survey (HABS) standards. These <br />standards include large format black and white photographs, an historical <br />narrative describing the architectural and historical characteristics of the building, <br />and measured drawings (or reproduced existing drawings if available). The <br />HABS documentation shall be archived at the City of Pleasanton Planning <br />Department and the City of Pleasanton Public Library. <br />3.Implementation of Mitigation Measures 4.D-1a and 4.D-lb <br />would not reduce the impact to less than significant as demolition of the <br />structures on Site 6 and 2lcould result in an adverse change in the significance <br />of a historical resource as defined in CEQA Guidelines Section 15064.5. <br />Draft SEIR, pp. 4.D-15 to 4.D-16.) <br />2. Transportation and Traffic <br />Impact 4.N-7 <br />Development facilitated by the General Plan Amendment and rezonings could <br />potentially add traffic to the regional roadway network to the point at which they would operate <br />unacceptably under Cumulative plus Project conditions. <br />The SEIR evaluates the impact of the proposed project related to the potential to <br />add traffic to the regional roadway network to the point at which they would operate <br />unacceptably under Cumulative plus Project conditions. <br />Significance Before Mitigation: Significant <br />Significance After Mitigation: Significant and Unavoidable <br />Finding: Changes or alterations have been required in or incorporated into the <br />Project, however, the changes would not reduce this impact to a less than <br />significant level. Mitigation Measure 4.N-7 is required in or incorporated into the <br />Project.